NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade site, Jan 2002

Machine-extracted title · confidence 28%

Night final daily workforce and equipment at World Trade, Jan 22, 2002.

NYC-WTC_000280832
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 sr Rjod. WZNlBMWia. N Y. 11357. (719)/BT-SCOO DATE: 1/22/02 night FINAL

DAILY WORK FORCE REPORT

lob Nam® & Location: World Trade Conter ICorrtrad No. Iweat/ier Conditions_____________________

|] Equipment ——a DescrIpnon CLASSIFICATION QUANT. II MANNED 'STANDav IDLE SUPERINTENDENT ICAT 966 LOADER 1 PROJECT ENGINEER 1 CiAT 973 LOADER 1 OFFICE ENGINEER CAT 335 GRAPPLER 1 iIfqremen 1 CAT 375 GRAPPLER 1 IISAFETY OFFICER ICAT 375 GRAPPLER 1 LASORERS_______ 9 {HITACHI 750 GRAPPLER ' 1 IRON WORKERS______ HITACHI S50 GRAPPLER 1 LOCAL 14_____________ [HITACH11200 GRAPPLER~ 1 {laSCFM COMPRESSOR 1 LOCAL 15 6 CARPENTER 1235 HAMMER HOE RAM •manned BY TULLY CARPENTER FOREMAN [mechanics TRUCK ~ 1 1 TEAMSTERS (FUEL) 1 P-POL TRUCK MECHANICS 1 {tool VAN HOUSE WRECKERS 2 ROLLOFF {dump TRAILERS ~ a YUKES 4 HIGH DECK TRAILERS 2 WELDING TRUCK_________ DELIVERIES: FUEL TRUCK 1 PICKUP TRUCKS 3 UGHT TOWERS__________ S SITE MULE 2 •NOTE: WTC TRUCKING 14 DRIVERS DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD OFFICE TRAILER/GENER 1 . DELAYS: TRUCK 62 WAS DELAYED FOR 2.5 HOURS CARGO BOXES___________ 4 DUE TO BRAKE PROBLEMS RAT TRUCK____________ 1 PUMP___________________ 2 RAINMAKER/GENIE LIFT ■ •235 MANNED BY TULLY FROM 5PM-12AM

----- Descriolion of Work: COMPLETED WORK - - Il — II 3 CONTINUED REMOVING DEBRIS FROM LOWER LEVELS OF TOWER TWO TO ACCOMODATE BRIDGE MAINTANED TRAFFIC FLOW INTO AND OUT OF AREA TRUCKS TO PIER 8 DEIAYED APPROXIMATELY 1 HOUR BY POT AND ConEd WORK ON TUNNEL ANO ROAD LOADS OUT: 117 ~ --- -------------------------------------------------- YUKES OUT; 120 --------------------------------------------------------------

GRACE CONTRACTING CORP Approvad By; BY; Title: For: SUPERIN TENOERT

D/VLY WORK FORCE REPORTOIZZNJds

CITY_21MC100_003918705

NYC-WTC_000280832

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000280832Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →