Daily work force report, World Trade site, Jan 2002

Machine-extracted title · confidence 28%

Night shift daily workforce and equipment at World Trade, Jan 17, 2002.

NYC-WTC_000280826
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. WhilcAWW, N.Y. 113Sr-(71J) TOT-flOOO DATE: 1/17/02 NIGHT FINAL

r DAILY WORK FORCE REPORT

Job Nam* 4 Location: World Trade Center Contract No. Weather Condition*: COOL. BUT NOT BAD FOR JANUARY

Labor QUANT. I[ equipment CLASSIFICATION I Oeacriptlon manned STANDBY IDLE SUPERINTENDENT 2 CAT gee LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE OFrcE ENGINEER CAT 973 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER 1 lIsAFETY OFFICER CAT 375 GRAPPLER 1 ^LABORERS 10 CAT 375 BUCKET IRON WORKERS HITACHI 730 GRAPPLER ■1

LOCAL 14_____________ S HITACHI 550 GRAPPLER LOCAL 1S_____________ 7 HITACH11200 GRAPPLER 1 CARPENTER IBS CFM COMPRESSOR 1 CARPENTER FOREMAN 235 hammer HOE RAM 1 TEAMSTERS__________ MECHANICS TRUCK 1 1 [[mechanics 2 TOOL TRUCK HOUSE WRECKERS 2 TOOL VAN FUEL TRUCK DRIVER 1 ROLL OFF DUMP TRAILERS LOW BED TRAILER oeLIVERIES: HIGH DECK TRAILERS WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 3 LIGHT TOWERS 5 [site MULE 3 DUMP Trucks 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD ^OFFICE TRAILER/GENER, 1 ^CARGO BOXES ■5

BfLAT TRUCK 1 BPUMP 2

Descfiplioh of Work:______________________________________________________________________________________ COMPLETEO WORK _______________________________________________________________________________________ PREPARING RAMP AT SLURRY WALL TO ENABLE MACHINES CROSSING INTO PIT FROM WEST SIDE HIGHWAY CONTINUED REMOVING DEBRIS FROM NORTH HALL ROAD AND LOWER LEVELS OF TOWER I TO ACCOMMODATE NEWBRIDGE.___________________________________________________________________________________________ _____ MAINTAINED TRAFFIC INTO AND OUT OF AREA LOADS OUT:_______________________________________________________________________________________ EUKES OUT: ______________ _________________________

GRACE CONTRACTING CORP | Approved By: BV Title: Tor BUPeRitrreNDENT

DAILY WORK FORCE REP(jRT01l7N xIs

CITY_21MC100_003918698

NYC-WTC_000280826

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000280826Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000356551

Night final daily workforce and equipment counts for World Trade site, Jan 17, 2002.