Daily work force report, World Trade, Nov 2001

Machine-extracted title · confidence 38%

Daily workforce and equipment listing for World Trade site, Nov 24, 2001.

NYC-WTC_000386639
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. i1-456lh Road, whlleslone, N.Y. 11357-(71B) 767-9000 DATE; SATURDAY NOVEMBER 24, 2001 NIGHT FINAL

daily WORK FORCE REPORT

Job Name & Location; World Trade Center Contract No. Weather Conditions CLOUDY &MILD

Labor Equipment ‘ CLASSIFICATION UANTIT Description ' MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER 1 SAFETY OFFICER 1 CAT375GRAPPLER 1 LABORERS 22 HITACHI 750 GRAPPLER ’ 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER; 1 LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR: 1 CARPENTER FOREMAN MECHANICS TRUCK 1 1 TEAMSTERS 9 TOOL TRUCK 1 MECHANICS 1 TOOL VAN HOUSE WRECKERS 6 ROLL OFF DUMP TRAILERS 5 LOW BED TRAILER HIGH DECK TRAILERS ' 3 WELDING TRUCK FUEL TRUCK ' 1 I PICKUP TRUCKS 2 IlLIGHT TOWERS 8 1 iIparts truck 1 llDUMP TRUCKS ’ ||l0 WHEEL DUMP TRUCK I FLASHING ARROW BOARD 1 lloFFICE TRAILER : 1 I CARGO BOXES . 3 [ FLAT TRUCK ’ 1 Ipump 2 185' FOOT GENIE ; 1 BANGEL AERIEL(DUST StJ^ 1 IGENERATOR 1

Description of Work:___________________ ________________________ _ _____________ . ______________________ BUILT RAMP FROM NW CORNER. RECEIVED 1200 DOWN- DAMAGED GRAPPLE-DIDNT WORK TONIG__________ TRUCK # 60 TRAILER FLAT TIRE _________________ ________________________________________________ 750 WENT DOWN DAMAGED HYDRAULIC LINE REPAIRED WITH PARTS FROM 1200 '______________________ MANNED TARPING AND TRIMMING STATIONS _________________________________ MANNED WATER STATIONS FOR DUST CONTROL _____________________ ______________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA___________________________________ ' CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2_________________ LOADS OUT 119______________________________________________________ '______________________ -/S XTi re*, re, 7T-X Jt; A/t>T7c<r- GRACE CONTRACTING CORP Y-' [Approved By; 'Title: ~ IsUPERINTENDEHT ' 1

CITY_21MC100_003695181

NYC-WTC_000386639

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000386639Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Daily work force report

NYC-WTC_000388188

Night final daily workforce report for World Trade site, Nov 27, 2001.

Similar indexed content

Compare copies and versions →