. GRACE CONTRACTING CORP. IS1.4S eth Road. Whitestone. N.Y. 11357-(718) 767.9000 DATE: MONDAY 12/3/01 NIGHT (FINAL)
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions CLEAR S COOL
Labor Equipment CLASSIFICATION QUANT Description MANNED STANDBY IDLE SUPERINTENDENT 2 ' CAT 966 LOADER 1 PROJECT ENGINEER ~ 1 ■ CAT 446 BACKHOE 1 OFFICE ENGINEER tcAT973 LOADER 1 FOREMEN 1 ■ CAT 365 GRAPPLER 1 SAFETY OFFICER ■ CAT 375 GRAPPLER 1 LABORERS 16 ■ HITACHI 750 GRAPPLER 1 IRON WORKERS ■ HITACHI 550 BACKHOE 1 LOCAL 14 5 ■ HITACHI 550 GRAPPLER 1 LOCAL 15 8 ■ HITACHI 1200 GRAPPLER 1 CARPENTER ' 185 CFM COMPRESSOR 1 CARPENTER FOREMAN ■ 235 HAMMER HOE RAM TEAMSTERS 11 ' MECHANICS TRUCK 1 1 MECHANICS 1 ■ TOOL TRUCK HOUSE WRECKERS 7 ■ TOOL VAN ■ ROLL OFF ’ DUMP TRAILERS 7 ■ LOW BED TRAILER ■ HIGH DECK TRAILERS 3 DUG INTO VISTA FROM EAST WITH 1200 - LOADED EUKES ■ WELDING TRUCK 375 DUG PARALLEL TO WEST SIDE OF WEST WALL ’ FUEL TRUCK 1 PROGRESSING NORTH - LOADED EUKES ■ PICKUP TRUCKS 2 750 DUG PARALLEL TO SOUTH SIDE OF NORTH WALL ■ LIGHT TOWERS 13 PASSED DEBRIS TO GATEWAYS 550 THEN TO 365 ■ SITE MULE 3 DROPPED PORTION OF WEST WALL_____________________ ' DUMP TRUCKS TULLY DRESSED ROAD WITH MILLINGS ■ 10 WHEEL DUMP TRUCK DUG OUT MILLINGS WEST OF 750 TON CRANE TO LEVEL * FLASHING ARROW BOARD 1 AND SET MATS. I “ OFFICE TRAILER/GENER. 1 NOTE: TULLY'S PC75O FELL INTO SOUTH PORTION OF CARGO BOXES 3 WEST SLURRY WALL -1200 PULLED IT UP. " FLAT TRUCK “ PUMP 2 ~ ROLLER ■ RAINMAKER/GENIE LIFT 1
Description of Work:
LOADS OUT:91. EUKE LOADS 17 LOAD OUT STEEL AND DEBRIS MANNED TARPING AND TRIMMING STATIONS MANNED WATER STATIONS FOR DUST CONTROL MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA EXCAVATE & GRADE CRANE PAD - SET MATS
GRACE CONTRACTING CORP Approved By; Title: ~ BY: For; SUPERINTENDENT ’
DAILY WORK FORCE REPORT 1203N.xls
CITY_21MC100_000698771 NYC-WTC_000280755
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000388366
Night shift daily workforce and equipment at World Trade site, Dec 3, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291383
December 3, 2001 night final daily work force report for World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291310
Night preliminary daily workforce report for World Trade Center site; labor and gear listed.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278690
Night shift daily workforce and equipment at World Trade Center, December 3, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305228
Night final daily workforce and equipment at World Trade site, Dec 3, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280084
Night shift daily workforce/equipment for World Trade Center, Dec 3, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279722
Labor/equipment counts and daily workforce details for World Trade Center project, Dec 3, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280007
Night shift workforce and gear at World Trade Center, December 3, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305047
Final daily workforce and equipment listing for World Trade Center site, December 2001.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419239
Night final daily workforce report for World Trade Center site, Dec 3, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280100
Final daily workforce and equipment report for World Trade Center, Dec 12, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322147
Night final daily workforce and equipment roster for World Trade Center site, December 11, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000388366
Night shift daily workforce and equipment at World Trade site, Dec 3, 2001.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291383
December 3, 2001 night final daily work force report for World Trade Center site.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291310
Night preliminary daily workforce report for World Trade Center site; labor and gear listed.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278690
Night shift daily workforce and equipment at World Trade Center, December 3, 2001.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305228
Night final daily workforce and equipment at World Trade site, Dec 3, 2001.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280084
Night shift daily workforce/equipment for World Trade Center, Dec 3, 2001.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000388366
Night shift daily workforce and equipment at World Trade site, Dec 3, 2001.
Similar indexed content
NYC-WTC_000291383
December 3, 2001 night final daily work force report for World Trade Center site.
Similar indexed content
NYC-WTC_000291310
Night preliminary daily workforce report for World Trade Center site; labor and gear listed.
Similar indexed content
NYC-WTC_000278690
Night shift daily workforce and equipment at World Trade Center, December 3, 2001.
Similar indexed content
NYC-WTC_000305228
Night final daily workforce and equipment at World Trade site, Dec 3, 2001.
Similar indexed content