GRACE CONTRACTING CORP. 151-45 6ih Road, Wnitestone, N.Y. 11357-(718) 767-9000 DATE: DECEMBERS, 2001 (NIGHT FINAL)
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions
Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER_________ 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER 1 CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER i SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS ’ 20 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 10 MECHANICS TRUCK 1 1 MECHANICS 1 TOOL TRUCK 1 HOUSE WRECKERS 7 TOOL VAN ROLLOFF DUMP TRAILERS 7 LOW BED TRAILER HIGH DECK TRAILERS 2 WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 2 LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TFLAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK 1 PUMP 2 ROLLER 1 RAINMAKERyGENIE LIFT 1
Description of Work:_______________________________________________________________________________________ LOADS OUT: 26 DUMP TRAILERS/HIGH BEDS; 33 EUCLIDS___________________________________________________ LOAD OUT STEEL AND DEBRIS____________________________________________________________________________ MAN TARPING AND TRIMMING STATIONS__________________________________________________________________ MAN WATER STATIONS FOR DUST CONTROL______________________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC'S ROADWAY CONTINUE BURNING OF THE NORTH WALL COLUMNS_______________________________________________________ ELEVATIONS: ALL MACHINES LEVEL B-5 253_______________________________________________________________ DELAYS: TOTAL DELAYS OF MACHINES IN HOLE APPROXIMATELY 1 HR FOR FDNY;___________________________ FREON RECOVERY FROM 7-10:30 PM, NO DUMP TRAILERS LOADED._____________________________________ GRACE CO^f^^^N^ORP Approved By: Title: BY: For: SUPERINTEND^T
DAILY WORK FORCE REPORT 1206N.xls
CITY_2 IMCl 0 Ci_0 013 8 3 0 6 8 NYC-WTC_000280001
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000280005
Night shift labor and machinery at World Trade Center, December 4, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388369
Day shift daily workforce and equipment at World Trade site, Dec 5, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269184
Night shift daily workforce with equipment allocations for World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388456
Daily workforce roster for World Trade Center project, December 5, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290080
Night preliminary daily workforce and equipment for World Trade Center project.
2 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269235
Day final daily workforce roster for World Trade site listing personnel and equipment.
2 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388188
Night final daily workforce report for World Trade site, Nov 27, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388368
Night shift daily workforce and equipment at World Trade site, Dec 4, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388451
Night preliminary daily workforce report for World Trade site, Dec 12, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305210
Night daily workforce for World Trade Center, December 7, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322600
Night preliminary workforce/equipment roster for World Trade site, Feb 3, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269186
Final daily workforce and equipment summary for World Trade Center night shift.
2 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000280005
Night shift labor and machinery at World Trade Center, December 4, 2001.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388369
Day shift daily workforce and equipment at World Trade site, Dec 5, 2001.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269184
Night shift daily workforce with equipment allocations for World Trade Center site.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388456
Daily workforce roster for World Trade Center project, December 5, 2001.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290080
Night preliminary daily workforce and equipment for World Trade Center project.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269235
Day final daily workforce roster for World Trade site listing personnel and equipment.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Night shift labor and machinery at World Trade Center, December 4, 2001.
Similar indexed content
NYC-WTC_000388369
Day shift daily workforce and equipment at World Trade site, Dec 5, 2001.
Similar indexed content
NYC-WTC_000269184
Night shift daily workforce with equipment allocations for World Trade Center site.
Similar indexed content
NYC-WTC_000388456
Daily workforce roster for World Trade Center project, December 5, 2001.
Similar indexed content
NYC-WTC_000290080
Night preliminary daily workforce and equipment for World Trade Center project.
Similar indexed content