NYC-WTC_000279996OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
1 • GRACE CONTRACTING CORP. 151-45 6th Road. Whitestone, N.Y. 11357-(718) 767-9000 DATE: NOVEMBER 20, 2001 FINAL
DAILY WORK FORCE REPORT II
/ Job Name & Location: World Trade Center Contract No. 1 Weather Conditions
Labor _____________Equipment
SUPERINTENDENT PROJECT ENGINEER OFFICE ENGINEER CLASSIFICATION
=a UANTIT~| ________ Description________ MANNED STANDBY IDLE CAT 966 LOADER__________ 1______________ CAT 446 BACKHOE________ ---- 1--------- ,----- 1 CAT 973 LOADER__________ FOREMEN CAT 365 GRAPPLER 1 I SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS________ IRON WORKERS_____ LOCAL 14__________ LOCAL 15__________ CARPENTER i 8 HITACHI 750 GRAPPLER HITACHI 550 GRAPPLER HITACHI 550 GRAPPLER HITACHI 1200 GRAPPLER 185 CFM COMPRESSOR I 1 1 1
CARPENTER FOREMAN MECHANICS TRUCK TEAMSTERS__________ TOOL TRUCK_____________ MECHANICS__________ HOUSE WRECKERS 4 TOOL VAN________________ ROLL OFF________________ DUMP TRAILERS__________ 5 LOW BED TRAILER________ HIGH DECK TRAILERS WELDING TRUCK_________ ' FUEL TRUCK_____________ ■ PICKUP TRUCKS__________ 5 ' LIGHT TOWERS___________ 12 DELIVERIES: AUSTER RUBBER________ ■ PARTS TRUCK____________ 1 MILLINGS (WHITESTONE) ' DUMP TRUCKS___________ ■ 10 WHEEL DUMP TRUCK PLASHING ARROW BOARD ' OFFICE TRAILER_________ 7 ■ TUBE TRAILER 2 ' FLAT TRUCK_____________ ' PUMP____________________ 2___ ' C-BOXES_________________ 3____ ■ 235 HOE RAM_____________ J__ 1 ■ ASPHALT ROLLER 1
Description of Work: PRELIMINARY/ANTICIPATED WORK____________ 'man TARPiNG AND TRIMMING STATIONS_______ MAN WATER STATIONS FOR DUST CONTROL MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA CONTINUE REMOVING DEBRIS FROM TOWER 2 BREAK OUT SLAB AT B3 IN CORE OF TOWER 3 LOADS OUT 71________________________________ 235 HOE RAM- USED FOR 2 HOURS____________ ASPHALT ROLLER- RAN FOR 4 HOURS GRACE CONTRACI^G C' :Xp Approved By. [Title:________ BY: „ For: SUPERINTENDENT y
NYC-WTC_000279996 CITY_21MC100_001382757
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000305235
Daily workforce roster for World Trade Center construction site, with crew classifications and equipment.
3 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419136
Final daily workforce report for World Trade Center with labor/equipment breakdown.
3 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305364
Day final daily workforce and equipment listing for World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305589
Day shift daily workforce and equipment at World Trade site, Dec 1, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419292
Day final daily workforce report listing crews and CAT/HITACHI equipment at World Trade Center.
3 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305586
Day shift daily workforce and equipment at World Trade site, Nov 29, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305037
Day final daily workforce and equipment at World Trade site, Nov 25, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302478
Night preliminary daily labor/equipment roster for World Trade site, Dec 18, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000408035
Day shift workforce and equipment at World Trade Center site, Dec 1, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356713
Final daily workforce and equipment for World Trade Center project, Nov 25, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322822
World Trade daily workforce and equipment, Dec 1, 2001 day shift.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280004
World Trade Center workforce and equipment data for December 4, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000305235
Daily workforce roster for World Trade Center construction site, with crew classifications and equipment.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419136
Final daily workforce report for World Trade Center with labor/equipment breakdown.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305364
Day final daily workforce and equipment listing for World Trade Center site.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305589
Day shift daily workforce and equipment at World Trade site, Dec 1, 2001.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419292
Day final daily workforce report listing crews and CAT/HITACHI equipment at World Trade Center.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305586
Day shift daily workforce and equipment at World Trade site, Nov 29, 2001.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000305235
Daily workforce roster for World Trade Center construction site, with crew classifications and equipment.
Similar indexed content
NYC-WTC_000419136
Final daily workforce report for World Trade Center with labor/equipment breakdown.
Similar indexed content
NYC-WTC_000305364
Day final daily workforce and equipment listing for World Trade Center site.
Similar indexed content
NYC-WTC_000305589
Day shift daily workforce and equipment at World Trade site, Dec 1, 2001.