NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily workforce report, World Trade Center, Nov 2001

Machine-extracted title · confidence 42%

Daily workforce report listing labor, equipment, and locations for World Trade Center site, Nov 2001.

NYC-WTC_000279991
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

oRACE CONTRACTING CORP. 151-45 6111 Road, Whr.eslone. N.Y. 11357-(718) 767-9000 DATE: SATURDAY NOVEMBER 24, 2001 NIGHT FINAL

DAILY WORK FORCE REPORT

Job Name & Location; World Trade Center Contract No. Weather Conditions CLOUDY &MILD

Labor _____________ Equipment CLASSIFICATION UANTIT Description ~~]1MANNED STANDBY Idle SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 I FOREMEN_____________ 2 CAT 365 GRAPPLER 1 SAFETY OFFICER 1 CAT 375 GRAPPLER 1 LABORERS 22 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 3 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN MECHANICS TRUCK 1 1 TEAMSTERS 9 TOOL TRUCK 1 MECHANICS 1 TOOL VAN HOUSE WRECKERS 6 ROLLOFF DUMP TRAILERS 5 LOW BED TRAILER HIGH DECK TFtAILERS 3 WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 2 LIGHT TOWERS 8 1 PARTS TRUCK 1 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER 1 CARGO BOXES 3 FLAT TRUCK 1 PUMP 2 85' FOOT GENIE 1 ANGEL AERIEL(DUST SUPR) 1 GENERATOR 1

Description of Work:» *___________________________________________________________________________ BUILT RAMP FROM NW CORNER. RECEIVED 1200 DOWN- DAMAGED GRAPPLE-DION'T WORK TONIG TRUCK # 60 TRAILER FLAT TIRE_________________________________________________________________ 750 WENT DOWN DAMAGED HYDRAULIC LINE REPAIRED WITH PARTS FROM 1200_________________ MANNED TARPING AND TRIMMING STATIONS __________________ ___________________________ MANNED WATER STATIONS FOR DUST CONTROL MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA__________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 LOADS OUT 119 ; ——

GRACE CONTRACTING CORP Approved By: Title: For: SUPERINTENDENT

CITY_21MC1OO_OO45O5387 NYC-WTC_000279991

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000279991Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →