Daily work force report, World Trade Site, Oct 2001

Machine-extracted title · confidence 28%

Day final daily workforce and equipment counts for World Trade site, date 10/25/01.

NYC-WTC_000279880
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

! i IT; GRACE CONTRACTING COW. T.i i J 151-45 eui Road, WMadona,’N.Y. HOT-(715) 757-8000 DATE: 10-; ri DAY FINAL

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor I Equipment CLASSIFICATION issoaiii! I Description *" SUPERINTENDENT 1 CAT 966 LOADER 1 PROJECT ENGINEER 2 CAT446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT245GRAPPLER SAFETY OFFICER 1 CAT235 GRAPPLER LABORERS 19 CAT375GRAPPLER 1 IRON WORKERS 1 CAT 365 GRAPPLER 1 LOCAL 14 4 HITACHI 750 1 LOCAL 15 6 HITACHI 550 GRAPPLER CARPENTER HITACH11200 1 CARPENTER FOREMAN 1 COMPACTION TRUCK Iteamsters 18 MECHANICS TRUCK 2 lECHANICS 3 TOOL TRUCK 2 ■'-'OUSE WRECKERS 3 TOOLVAN 1 ROLL OFF 1 DUMP TRAILERS 5 LOW BED TRAILER 1 HIGH DECK TRAILERS 7 Cj.-l-a'ai'rCA ' OO WELDING TRUCK 2 “ FUEL TRUCK 1 ~ PICKUP TRUCKS 5 ~ UGHTTOWERS 8 PARTS TRUCK 1 “ DUMPTRUCKS “ 10 WHEEL DUMP TRUCK " LIQUID OXYGEN 9 " OXYGEN TRAILER 1 " OXYGEN 80 " ACETELYNE (MED) 10 ACETELYNE (LARGE) 20 “ OFFICE TRAILER 1 " TUBE TRAILER 3 Deecription of Work:_______________________________________________________________________________ REMOVE STEEL AND DEBRIS EAST WALL NORTH EAST CORNER VISTA HOTEL AND WEST WALL TOWER 2 3 - DELAYS TOTALING 3.8 HOURS DUE TO FIRE DEPT. SEARCH & RESCUE ON TOP OF PILE WEST WALL TOWERS_________________________________________________________________________________ MANNED TARPINO STATION________________________________________________________________ _ MANNED WATER STATION FOR DUST CONTROL_______________________________________________ _ MAINTAINED TRAFFIC FLOW IN AND OUT OF WORK AREA__________________________________________ 109 LOADS REMOVED( 80 ON GRACE TRUCKING)

GRACE COWTRACTINO CORP Approved By: TW«_______ BY:__________ For SUPERlNTEMOeWT

CITY_21MC100_004496648

NYC-WTC_000279880

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000279880Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000408021

Final daily workforce report for World Trade Center project.

Similar indexed content

Compare copies and versions →