facilities, and these anticipated changes have caused increases in sen-ice, revenue vehicle miles having
significant increases to MTA-LlB's paratransit budget
for 2002.
CitT of Long Beach-Total Operations
Revenue Vehicle Miles
The revenue passengers per revenue vehicle mile, for
MTA Long Island Bus, a measure of serxhcc
effectiveness, has increased over the five year period at
a 2.7 percent annualized rate. This measure was stable I 200 '
for partrasnit over the five years declining by a slight I 175
3
.61 percent annualized rate, but increasing in 2000 by I- 150
3.5 percent over 1999.
125
I
100 '—•------------------------
Cost per mile for the LI Bus fixed route service has 1996 1997 1998 1990 2000
Year
increased from 1996 to 2000 by 2.7 percent, slightly
greater than inflation for the period. Despite the
dramatic increase.s in paratransit services, the costs of
operating this serx ice remain surprisingly low: in 2000 increased from 193,899 in 1996 to 208,986 in 2000.
the cost per mile for paratransit serx-’ice was $3.13 xvhile As a result, passengers per mile declined over the five
the corresponding cost per mile for fixed route services year period by an annualized rate of 8.59 percent.
was $8.11. Cost per mile for paratransit actually Long Beach's fixed route system costs have been
declined over the five year period by an annualized 5.6 relatively stable during the 1996-2000 period, and
percent. increases have occurred at about 'A the rate of inflation.
The ratio of operating revenue to operating cost for The ratio of operating revenue to operating cost for the
Long Island Bus, a measure of service economy, fixed route portion of the Long Beach system has
declined at an amiualized rate of 6.1 percent, ranging declined by an annualized rate of 2.8 percent over the
from 45.98 percent in 1996 to 40.47 percent in 2000. five year period, with an improvement of 3.47percent in
Cost recovei-y for paratransit improved over this period 2000, reflecting the increase in ridership over 1999.
by an annualized rate of 3.26 percent, ranging from The cost recovery for these services ranged from 38.88
7.42 percent in 1996 to 9.12 percent in 2000. percent in 1996 to 33.51 percent in 1999.
City of Long Beach Transit Paratransit services have been provided since 1998.
Paratransit riders, while growing at a significant rate
The City of Long Beach, in Nassau County, operates (there were 3,694 in 1998 and 5,081 in 2000) only
local transit fixed route and paratransit services within accounts for 2.4 percent of Long Beach's total
its municipal boundaries. The total ridership for the ridership. Paratransit cost recovery improved from
Long Beach system has experienced a long term trend 1999 to 2000 by 1.9 percent, but like most paratransit
of decline, dropping at an annualized 6.86 percent service, at 2.79 percent it is much lower than is typical
between 1996 and 2000. Ridership in 2000, however, of other modes.
xvas acmally up 3.2 percent from 1999.
The decreasing ridership corresponded with modest Long Beach is advancing a major rehabilitation project
for their maintenance facility and, with MTA Long
Cits’ of Long Beach-Total Operations Island Rail Road, is creating a decked commuter
Revenue Passengers
parking facility adjacent to the Long Beach Railroad
750 I Station and City Hall.
650
•S 550
sg 450 —o
350
250
150
1996 1997 1998 1999 2000
Year