Emergency planning, Buildings Dept 9/11 guide

Machine-extracted title · confidence 28%

Building Department memo/guide related to emergency planning after 9/11.

NYC-WTC_000279102–000279175
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Building infrastructure is key. Many buildings built before (he ! ■ Location. Proximily to customers, workers, vendors, distrib­ utors, or transportation, coupled with tax structures, com­ advent of electric lighting and mechanized ventilating systems in mute time.s, and residential options for workers, may also be the 193ns are candidates for renovation. Because they relied on important factors. Location analysis should include trans­ windows for illumination and ventilation, these buildings have portation infrastructure, zoning and land use strategies, and more daylight, smaller floorplates, and greater floor-to-floor « environmental studies. height.s than many more modern structures. In addition, mecha­ Comprehensive valuation entails evaluating a building's capac­ nized HVAC services were added as post-construction retrofits, so ity to provide adequate thermal and lAQ control, sufficient electri­ these services are not deeply imbedded in the building structure. cal performance and quality, and adequate telecommunications On the other hand, buildings from more recent decades may pose connections. The financial feasibility of retrofitting depends on challenges. Built for economy and energy efficiency, many arc too j three key factors: the flexibility of the building infrastructure, the tightly constructed - with huge floorplates, deeply imbedded serv- I value of the existing investment, and the cost of alternative build­ ices that prevent adequate air exchange (in extreme cases, causing i ing options. Sick Building Syndrome), and minimal floor-to-floor heights. continued t

Renovation Factors

I I Occupancy wall to evaluate lengths of runs. Lighting ■ Diffuser density: Smaller zones for Density Infrastructure heating and cooling diffusers increase per Floor thermal comfort. Indices Limiting Factors: ■ Ventilation capacitance: Standards for ■ Light fixture density: The type and ■ Floor loading/structural limits; The air exchange rates must be met. density of fixture should match the building must be able to bear the functions in the workplace.

I weight of any structural changes, as Network ■ Lighting quality: Individual task lighting well as the occupancy load. should maintain consistent footcandles i Infrastructure ■ Floor-to-floor heights: Interior ceiling on worksurfaces without glare, accord­ heights of 9.5 feet are optimum for Indices ing to Illuminating Engineering Society lighting, acoustics, and thermal control. ■ Electrical power capacitance: Adequate (IES) standards, Floor-to-floor heights, minus the service for current use, from HVAC and ■ Lighting zone size: Smaller zones, with i required ceiling plenum, determine inte­ elevators to lighting and computers, more controllers, enhance the quality of rior ceiling heights. must be available. Evaluate current and light for the maximum number of work­ ■ Column density: Column grids deter­ future needs to determine the watts ers. Assess typical lighting load cost or mine the flexibility of the space. For inte­ and outlets required per square foot. wattage costs per square feet. rior planning, columns are obstructions • Network support: Telecommunications • Daylight; Evaluate the percentage of that can create unusable, wasted space. systems require significant vertical and rentable square feet within 20 feet of a ■ Egress limits: Current codes for safety, horizontal channels for cabling; the struc­ window. such as adequate exits in the event of a ture and space must accommodate the ■ Control; Assess the degree of user con­ fire, must be met. anticipated volume and change rate. Will trol over light levels via off/on switches ■ Elevator capacitance: In buildings of the plenum be required for cabling? If so, and dimmers. Consider occupancy sen­ more than three stories, elevators must is there adequate space for anticipated sors for energy savings. be able to accommodate people and volumes? For grovrth? For change?

I equipment without lengthy delays. ■ Density of data, power, and voice out­ Facility lets: Access to services must be available Management

I HVAC to accommodate increasing and chang­ ing needs. Evaluate current and future Indices Infrastructure needs to determine the telecommunica­ • Costs: Assess the amount spent per year Indices tions outlets required per square foot. as percentage of current plant value. » HVAC; Zones should be small enough, ■ UPS support: What degree of protec­ ■ Ratio; Evaluate the number of full-time ' with ample thermostats and diffuser tion will be required? exempt (FTE) workers to square feet. density, to provide thermal comfort and ■ Data cabling: What is the required speed ■ Change: Assess anticipated churn rate air quality. Assess typical cooling load of data transfer per workstation? What of FTE workers. B i costs or BTU costs per square feet. phone system will be specified? How will Assess distance from core to window cabling support these requirements?

November 2001 BUILDINGS 37 1 WWW.buildings.com

CITY_21MC100_011994431

NYC-WTC_000279140

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000279140Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →