I Existing investment in a building affects the financial feasibility ✓ what will be the financial considerations? of renovation options. Depreciation schedules, debt ratios, oper ✓ What arc tax liabilitie.s likely to include? 11 ating costs, revenues, and tax liabilities are all part of the equa ✓ Will depreciation limitations prevent efficient renewal? tion. Tax implications of renovation costs vary widely. Most capi ✓ Will the day-to-day churn rate change? tal improvements follow a 39-year depreciation schedule. Per flexibility, speed, and cost often emerge as the top objectives. sonal property improvements, however, are generally on a seven- If, for example, a developer seeks to lease space after renovation, year depreciation schedule. Planning renovations to shift the long-term flexibility will top the priority list. If the renovator financial burden from capital improvement to personal property seeks to occupy the space to meet busines.s deadlines, speed will costs can result in tremendous tax savings. Even dormant, truly drive the fit-out strategy. If the renovator i.s also the sole tenant of j obsolete buildings - older vacant structures, which could not be the building, cost and tax considerations may be a top concern. j j profitably renovated and leased with traditional construction methods - may be candidates for reclamation with new sokition.s Advantages of Modular Solutions I t' that integrate architecture, furniture, and technology. The facility objectives that emerge from the process will drive Alternative options are also major factors in deciding whether the interior lit-out plan. Modular solutions expedite renowition to renovate or build. In one case, a business elected to renovate ;ind project completion. With thorough planning and design, existing warehouse space into Class A office space because .a and off-sitc manufacturing of architectural elements, the con- ' move would have displaced half the trained workforce. The com struction phase is much like a sophisticated assembly project bined costs of construction and replacing workers were greater Unlike traditional construction methods, this approach mini- than the single cost of renovating existing space. mize.s the time involved in on-site renovation. Major phases arc completed in quality-controlled, cost-efficient factories. Developing Facility Objectives financial implications play a key role. Traditionally, building With business needs clearly defined and a building selected for owners have evaluated man)' criteria to choose one of two build- j renovation, decision-makers should proceed with the develop ing investment strategies: first costs or life-cycle costs. Those who ment of design and facility objectives. Questions to ask include: focus on first costs are seeking the lowest initial purchase price to ✓ How much space will we need? free cash for other initiatives. Those who focus on life-c)'cle costs ✓ What will our business be? focus on the lowest cost over the life of an investment, consider ✓ What deliverables will we produce? ing maintenance, reconfiguration, and depreciation rates. ✓ Who will our customers be? While modular interior sokition.s are competitive with the first ✓ How will we communicate? costs of traditional constructions, the most significant benefits and I ✓ How will technology impact the workers’ saving.s arc realized over the life of the installation. Because oi L'..S. ✓ How will space support the technology? tax codes, flexible and modular solutions have clear advantage'' ✓ Can the infrastructure support increases and decreases in the over traditional interior build-out construction approaches. workforce? Movable architectural elements, such as raised floors, are con ✓ Will workforce need.s change? sidered personal property instead of capital iniprt'vement s under the tax code, with a seven-year depreciation schedule instead of a 39-year timetable. In a major renovation, improvements to the site, structure, and skin are considered capital improvements, for It .can. cost as ymuch. to example, new roads, building additions, new skylights and doors. and a new fayade will still require a 39-ycar depreciation cycle. renovate ^an e)^i,^ting Some improvement.s to services, such as new chillers and new plumbing, are also capital improvements. „bu11ding as it does to But in the interior fit-out phase, many improvements to serv ices and the space plan can be accomplished with modular ele- build from scratch. ment.s that qualify as movable personal property. Il designed to be installed, moved, and reinstalled elsewhere, the floor, lights, However, witK phosed electrical wiring, and network cabling can be fully depreciated in , Z.-C-Y’"' . p P'/ ' _ ' iiist seven years. And if a business relocates, all the movable ele ' ^b<rior construction., ments can go along. In addition, personal property i.s typically assessed at a much losses may be able lower rate than capital properl)', if it is taxed at all. Codes and cir- to liccupy space as it cumstance.s vary, but in almost every state of the United States. the abililv to eliminate major portions of interior architecture 2 ■' from the property assessment and annual ta.x hill can be a is renovated, resulting tremendous financial advantage. B
in ?nd!j:yoccupancy cost l’am fircmirr i.s manager of Workplace Knowledge and .Scrviics .11 Steelease Ine., C,rand Rapids, .Ml. For more iHfprinutinn. visit savings. (www.steelcase.com).
38 BUILDINGS November 2001 www.buildings.com
CITY_21MC100_0 11994432
NYC-WTC_000279141
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000143354
Fragmented text containing only a reference number and unreadable characters from the DEP Box 06 collection.
15 shared non-person entities · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141870
Form document with significant degradation or scanning quality issues making content indecipherable.
14 shared non-person entities · similarity 0.968
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141922
McGraw-Hill construction and engineering trade publication; appears unrelated to 9/11 environmental records.
9 shared non-person entities · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000142413
Comprehensive FAQ addressing downtown building access, reopening areas, property manager contact procedures, and building damage status in lower Manhattan.
5 shared non-person entities · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000276036
Document discussing lessons learned in children's environmental health related to Ground Zero sites.
17 shared non-person entities · 1 shared topics · similarity 0.953
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000152327
A financial document from late September 2001 related to water supply operations and emergency response costs.
11 shared non-person entities · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000152445
An official press advisory announcing the cancellation of the 2001 deer hunting season and suspension of public access.
14 shared non-person entities · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149798
Generic form or header page from the Department of Environmental Protection regarding general World Trade Center notices and requests.
15 shared non-person entities · 1 shared topics · similarity 0.951
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000166488
Department of Buildings report containing findings and recommendations regarding the World Trade Center site.
5 shared non-person entities · 1 shared topics · similarity 0.951
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140959
Form authorizing the City of New York to proceed with obligations related to FEMA emergency management programs for WTC cleanup.
8 shared non-person entities · 1 shared topics · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000137113
Archival folder label for September 11 news clippings from the Office of the Mayor, identified as Folder 0124.
11 shared non-person entities · similarity 0.949
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000120641
Management submits environmental test results and details of common area cleaning and facade washing for multiple Rector Place buildings.
7 shared non-person entities · similarity 0.949
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000136670
Archival folder label from the Office of the Mayor for World Trade Center records, identified as Folder 0140.
Similarity score 0.925 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000136670
Archival folder label from the Office of the Mayor for World Trade Center records, identified as Folder 0140.
Similarity score 0.917 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000169936
Draft lease agreement between the City of New York and 7 World Trade Company for Mayor's Office space.
Similarity score 0.917 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000170296
Draft lease agreement between the City of New York and 7 World Trade Company for 45,815 square feet at 7 World Trade Center.
Similarity score 0.917 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000136670
Archival folder label from the Office of the Mayor for World Trade Center records, identified as Folder 0140.
Similarity score 0.917 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000136670
Archival folder label from the Office of the Mayor for World Trade Center records, identified as Folder 0140.
Similarity score 0.917 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000143354
Fragmented text containing only a reference number and unreadable characters from the DEP Box 06 collection.
Similar indexed content
NYC-WTC_000141870
Form document with significant degradation or scanning quality issues making content indecipherable.
Similar indexed content
NYC-WTC_000141922
McGraw-Hill construction and engineering trade publication; appears unrelated to 9/11 environmental records.
Similar indexed content
NYC-WTC_000142413
Comprehensive FAQ addressing downtown building access, reopening areas, property manager contact procedures, and building damage status in lower Manhattan.
Similar indexed content
NYC-WTC_000276036
Document discussing lessons learned in children's environmental health related to Ground Zero sites.
Similar indexed content