GRACE CONTRACTING CORP. 151.45 6lh Road. Whitestona, N.Y. 11357-(718) 767-9000 DATE: DECEMBER 4, 2001 (DAY FINAL)
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions : I __________________ I Labor_______ Equipment CLASSIFICATICiN QUANT. Description SUPERINTENDENT I 2 CAT 966 LOADER 1 PROJECT-ENGINEER 2 CAT 446 BACKHOE 1 OFFICE ENGINEER i CAT 973 LOADER 1 FOREMEN_________ j_________________ 1 CAT 365 GRAPPLER 1 SAFETY OFFICER 1 CAT 375 GRAPPLER 1 LABORERS 21 HITACHI 750 GRAPPLER 1 IRON WORKERS 1 HITACHI 550 GRAPPLER 1 LOCAL 14 4 HITACHI 550 GRAPPLER T LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 2 235 HAMMER HOE RAM 1 TEAMSTERS 11 MECHANICS TRUCK 2 MECHANICS______ ;_________________ 2 TOOL TRUCK 1 HOUSE WRECKERS 7 TOOL VAN 1 ROLL OFF DUMP TRAILERS 7 I LOW BED TRAILER DELIVERIES; OZONE PARK LUMBER HIGH DECK TRAILERS 3 AWISCO BATTERIES WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 8 LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK 1 LIGHT TOWERS USED FOR 2.5 HOURS PUMP 2 ROLLER 1 RAINMAKER/GENIE LIFT 1
Description of Work; LOADS OUT: 67 LOAD OUT STEEL AND DEBRIS____________ MANNED TARPING AND TRIMMING STATIONS MANNED WATER STATIONS FOR DUST CONTROL MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC'S ROADWAY CONTINUE BURNING OF THE SW CORNER COLUMN BEAMS ELEVATIONS: ALL MACHINES LEVEL B-S 253_____________ YUKE LOADS 76 : GRACE contracting COR^ Approved By: Title: For: I SUPERINTENDENT
DAILY WORK FORCE REPORT 1204D.xls I
CITY_21MC100_006972371
NYC-WTC_000279001
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000280085
Day shift daily workforce and equipment at World Trade Center, Dec 4, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000281692
Daily labor/equipment listing for World Trade Center project; includes counts and descriptions.
1 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305044
Daily workforce and equipment summary for World Trade Center construction site, December 2001.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291309
Day final daily workforce and equipment summary for World Trade Center construction.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429726
Day final daily workforce and equipment at World Trade Center, Dec 12, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278622
Day final daily workforce report detailing labor and equipment allocations.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388448
Night final daily workforce report for World Trade site, Dec 13, 2001; includes conditions.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302484
Night preliminary daily labor/equipment roster for World Trade site, Dec 14, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278674
Daily workforce and equipment list for World Trade Center, December 12, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388375
Daily labor/equipment roster for World Trade Center site, Dec 2001.
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388393
Final daily workforce report for World Trade site, listing personnel and equipment by day.
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291292
Night final daily workforce report for World Trade site with weather notes (Dec 12, 2001).
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000280085
Day shift daily workforce and equipment at World Trade Center, Dec 4, 2001.
Similar indexed content
NYC-WTC_000281692
Daily labor/equipment listing for World Trade Center project; includes counts and descriptions.
Similar indexed content
NYC-WTC_000305044
Daily workforce and equipment summary for World Trade Center construction site, December 2001.
Similar indexed content
NYC-WTC_000291309
Day final daily workforce and equipment summary for World Trade Center construction.
Similar indexed content
NYC-WTC_000429726
Day final daily workforce and equipment at World Trade Center, Dec 12, 2001.
Similar indexed content