Grace Contracting daily workforce, Dec 12, 2001 (Night)

Machine-extracted title · confidence 60%

Night shift daily workforce report for World Trade Center site, December 12, 2001.

NYC-WTC_000278985
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 6th Road, Whitestone N.Y. 11357-(718) 767-9000 DATE: DECEMBER 12, 2001 (NIGHT FINAL)

DAILY WORK FORCE REPORT

Job Name & Location World Trade Center Contract No. Weather Conditions COOL - OVERCAST & DRIZZLE ssss __________________ i Labor_________ Equipment I CLASSIFICATION QUANT. Description MANNED STANDBY iDLE SUPERINTENDENT j_________________ ' 2 CAT 966 LOADER 1 PROJECT ENGINEER; 1 CAT 446 BACKHOE 1 OFFICE ENGINEER j_________________ ' 1 CAT 973 LOADER 1 FOREMEN■ 2 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 19 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15_______ '_ 8 HITACHI 1200 GRAPPLER 1 CARPENTER ' 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS_______ ' 1 MECHANICS TRUCK 2 MECHANICS_______ I__________________ ' 2 TOOL TRUCK 1 HOUSE WRECKERS | 12 TOOL VAN ROLL OFF 1200 PASSING MATERIAL FROM WEST SLOPE TO DUMP TRAILERS BOTTOM OF HOLE - 750/ 375 LOADING OUT LOW BED TRAILER EUKES AND FLATS. 973 ALSO LOADING EUKES. HIGH DECK TRAILERS WELDING TRUCK CONTINUED WIDENING ROAD TO AMEC SITE FUEL TRUCK 1 PICKUP TRUCKS 2 550 LOADING TRUCKS FROM TOP TO GRACE TRUCKS. LIGHT TOWERS 13 SITE MULE 3 BURNERS CONTINUED ON NORTH WALL DUMP TRUCKS 10 WHEEL DUMP TRUCK LOADS OUT; FLASHING ARROW BOARD 1 GRACE - 35 LOADS i OFFICE TRAILER/GENER. 1 TULLY AREA 61 EUKES AND 10 FLATS CARGO BOXES 3 AMEC -105 TOTAL (39 GRACE AND 65 DOS) FLAT TRUCK 1 PUMP 2 ROLLER 1 RAINMAKER/GENIE LIFT 1

Description of Work: ;__________________________________________________________ COMPLETED WORK__________________________________________________________ LOAD OUT STEEL AND DEBRIS_______ ;_________________________________________ MANNED TARPING AND TRIMMING STATlijNS____________________________________ MANNED WATER STATIONS FOR DUST CONTROL________________________________ MAINTAINED TRAFFIC FLOW IN AND OUT OF AREA_______________________________ CONTINUED REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 INSTALLED OF GPS SYSTEMS_________________________________________________ ELEVATIONS: ALL MACHINES LEVEL B-5 253

GRACE CONTRACTING CORP Approved By: Title; BY: For: SUPERINTENDENT

DAILY WORK FORCE REPORT 1212N.xls

CITY_21MC100_006972354

NYC-WTC_000278985

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000278985Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →