&r . Bovis Lend Lease I LMB, Inc. December 13, 2001 200 Park Avenue 9th Floor TO: Dan Mirt, Nicholson New York, NY 10166
Telephone FROM; Ray Master, BLL Safety 212 592 6700 Facsimile 212 592 6983 Cc: J. Abadie; P. Ashlin; B. Peters; M. Ross} M. Bielawa www.bovislendlease.com
Subject: WTC Disaster Recovery Project - Personal Protective Regional Headquarters London Equipment Use and General EHS Program Compliance New York Sydney With respect to the above subject, several issues have come up that require your immediate attention;
o Bovis and Liberty Mutual safety representatives have observed the use of PPE among Nicholson personnel and subcontractors as being inconsistent, particularly the use of respiratory protection, hearing protection, and safety glasses. (See Attached) 0 Protruding rebar at the same elevation as walking/working surfaces requires guarding to protect against a struck-by/against hazard. (See Attached)
Particular attention has been paid to the Nicholson operation and PPE usage for the following reasons;
o Air sampling results indicate a potential overexposure to the OSHA Permissible Exposure Limit (PEL) for silica for concrete work (i.e., core drilling, concrete mixer operations, chipping, etc). (See Attached) o Noise dosimeter readings indicate a potential overexposure to the OSHA PEL for noise. (See Attached)
Please be advised that all of your personnel are required to meet the EHS requirements established at the site. This includes, but is not limited to, assuring that all personnel are incorporated into a respiratory protection program as described in the December 12, 2001 correspondence clarifying site policy (Re: WTC Disaster Recovery Project - Respiratory Protection Program Clarifications and Reiterations - Dec. 12, 200]).
Also, please note that all personnel are required to attend the site safety orientation as discussed in a previous correspondence (Re: Safety Orientation Training - WTC Disaster Recovery Project - December 6, 200/) Please contact Ray Master to arrange for scheduling.
CITY_21MC100_008184747
NYC-WTC_000278862
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000408015
Minutes from WTC EHS meeting with attendees listed.
1 shared non-person entities · 1 shared topics · similarity 0.920
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149936
Joint OSHA and Bechtel crane inspection report analyzing safety conditions at the World Trade Center site.
2 shared non-person entities · similarity 0.924
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
1 shared non-person entities · similarity 0.921
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000104576
Fragmented document header or note related to environmental activities at 40 Fulton Street in March 2002.
Similar document embedding; no shared entity or topic indexed. · similarity 0.920
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000161939
Page from a laboratory report containing only formatting characters and no readable content.
1 shared topics · similarity 0.920
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000146129
Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
3 shared non-person entities · similarity 0.919
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154488
Memo summarizing daily activities including Church Street paving for a memorial service on October 23, 2001.
1 shared non-person entities · similarity 0.919
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154452
Fax memo summarizing WTC daily activities including water access requests and a FEMA meeting on demolition permits.
1 shared non-person entities · 1 shared topics · similarity 0.919
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000281853
Lease/AMEC meeting minutes with attendees and agencies listed.
1 shared non-person entities · 1 shared topics · similarity 0.919
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302113
Minutes from AMEC meeting with attendees including EHS and agencies regarding WTC site.
1 shared non-person entities · 1 shared topics · similarity 0.918
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150233
Cover page for a laboratory report regarding landfill operations, dated October 2001.
1 shared non-person entities · 1 shared topics · similarity 0.918
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000418420
Memo discussing ongoing cleaning and air testing for OCR building, indoor/outdoor air quality results, HEPA filtration details.
2 shared non-person entities · similarity 0.917
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000388763
Internal memo about lease details related to a building project at 200 Park Avenue, dated January 11, 2002.
Similarity score 0.951 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388957
Sign-in and shift records for demolition crews working on WTC sites, noting duties and safety observations.
Similarity score 0.951 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000281324
Memo regarding WTC project, project manager contact and client info.
Similarity score 0.950 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000234792
Sign-in sheet and safety observation log for Department of Design and Construction workers at the World Trade Center site on November 17, 2001.
Similarity score 0.950 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000436935
Sign-in sheet and safety observation log for Department of Design and Construction workers at the World Trade Center site on November 17, 2001.
Similarity score 0.950 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322749
Internal communication from design firm related to DDC project at 200 Park Avenue, January 2002.
Similarity score 0.949 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Joint OSHA and Bechtel crane inspection report analyzing safety conditions at the World Trade Center site.
Similar indexed content
NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
Similar indexed content
NYC-WTC_000104576
Fragmented document header or note related to environmental activities at 40 Fulton Street in March 2002.
Similar indexed content
NYC-WTC_000408015
Minutes from WTC EHS meeting with attendees listed.
Similar indexed content
NYC-WTC_000161939
Page from a laboratory report containing only formatting characters and no readable content.
Similar indexed content