GRACE CONTRACTING CORF'. 151-45 8lh Road, Whitestone. N.Y. 11357-(715)787-9000 DATE: DECEMBER 4, 2001 (DAY FINAL)
DAILY WORK FORCE REPORT
Job Name & Location; World Trade Center Contract No. Weather Conditions
Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY OLE SUPERINTENDENT . 2 CAT 966 LOADER 1 PROJECT-ENGINEER 2 CAT 446 BACKHOE 1 OFFICE ENGINEER : CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER , 1 CAT 375 GRAPPLER r—!—
LABORERS 21 HITACHI 750 GRAPPLER i IRON WORKERS 1 HITACHI 550 GRAPPLER 1 LOCAL 14 4 HITACHI 550 GRAPPLER 1 LOCAL 15 6 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 2 235 HAMMER HOE RAM 1 TEAMSTERS 11 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK 1 HOUSE WRECKERS 7 TOOL VAN 1 ROLL OFF DUMP TRAILERS 7 LOW BED TRAILER DELIVERIES: OZONE PARK LUMBER HIGH DECK TRAILERS 3 AWISCO BATTERIES WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 8 LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. T CARGO BOXES 3 FLAT TRUCK 1 LIGHT TOWERS USED FOR 2.5 HOURS PUMP 2 ROLLER 1 RAINMAKER/GENIE LIFT 1
Description of Work:____________________________________________________________________________________ ; LOADS OUT: 67_______________________________________________________________________________________ 1 LOAD OUT STEEL AND DEBRIS____ ZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZiZ MANNED TARPING AND TRIMMING STATIONS_____________________________________________________________ MANNED WATER STATIONS FOR DUST CONTROL__________________________________________________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA___________________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC'S ROADWAY CONTINUE BURNING OF THE SW CORNER COLUMN BEAMS ELEVATIONS: ALL MACHINES LEVEL B-5 253 YUKE LOADS 76 GRACE C9NTRAC~l(f>IG COR^ Approved By: Title: BY; For: SUPERINTENDENT
DAILY WORK FORCE REPORT 1204D.xls
CITY_21MC1OO_OO4752869 NYC-WTC_000278689
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000266919
Day final daily workforce status for World Trade Center project.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269185
Final daily workforce and equipment summary for World Trade Center project night shift.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280089
Final daily work force report listing personnel and equipment for World Trade Center project site, Dec 6, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305224
Day final daily workforce and equipment at World Trade site, Dec 4, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305210
Night daily workforce for World Trade Center, December 7, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388374
Night shift daily force report for World Trade Center project, Dec 7, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302465
Night preliminary daily workforce and equipment for World Trade site, Dec 21, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305223
Night preliminary daily workforce and equipment at World Trade site, Dec 4, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280087
Daily workforce and equipment tallies for World Trade Center site, Dec 5, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000266957
Final day workforce and equipment for World Trade Center project, Dec 2001.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278687
World Trade Center site workforce and equipment records, December 5, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388367
Day shift daily workforce and equipment at World Trade site, Dec 4, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000266919
Day final daily workforce status for World Trade Center project.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269185
Final daily workforce and equipment summary for World Trade Center project night shift.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280089
Final daily work force report listing personnel and equipment for World Trade Center project site, Dec 6, 2001.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305224
Day final daily workforce and equipment at World Trade site, Dec 4, 2001.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305210
Night daily workforce for World Trade Center, December 7, 2001.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388374
Night shift daily force report for World Trade Center project, Dec 7, 2001.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000266919
Day final daily workforce status for World Trade Center project.
Similar indexed content
NYC-WTC_000269185
Final daily workforce and equipment summary for World Trade Center project night shift.
Similar indexed content
NYC-WTC_000280089
Final daily work force report listing personnel and equipment for World Trade Center project site, Dec 6, 2001.
Similar indexed content
NYC-WTC_000305224
Day final daily workforce and equipment at World Trade site, Dec 4, 2001.
Similar indexed content
NYC-WTC_000305210
Night daily workforce for World Trade Center, December 7, 2001.
Similar indexed content