Daily work force report, World Trade Center, Dec 11 2001

Machine-extracted title · confidence 28%

Workforce and equipment summary for World Trade Center project, December 11, 2001.

NYC-WTC_000278676
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-15 6th Road, Whitestone, N.Y. 11357-(718) 767-BOOO DATE: DECEMBER 11,2001 (DAY ) FINAL DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. ’ Weather Conditions i

Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT ______________ 2 ' CAT 966 LOADER 1 PROJECT ENGINEER_____________ 2 ■ CAT 446 BACKHOE 1 OFFICE ENGINEER j______________ ■ CAT 973 LOADER 1 FOREMEN 1 ■ CAT 365 GRAPPLER 1 SAFETY OFFICER ' 1 ’ CAT 375 GRAPPLER 1 LABORERS 22 ■ HITACHI 750 GRAPPLER 1 IRON WORKERS 1 ■ HITACHI 550 GRAPPLER 1 LOCAL 14 5 ■ HITACHI 550 GRAPPLER 1 LOCAL 15 9 ■ HITACHI 1200 GRAPPLER 1 CARPENTER 1 ■ 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 ■ 235 HAMMER HOE RAM 1 TEAMSTERS 1 ■ MECHANICS TRUCK 2 MECHANICS_______ ;_____________ 2 'TOOL TRUCK 1 HOUSE WRECKERS 8 'TOOL VAN 1 ' ROLLOFF ■ DUMP TRAILERS ' LOW BED TRAILER DELIVERIES: TRIBORO HARDWARE: ' HIGH DECK TRAILERS AWISCO ' WELDING TRUCK 1 ' FUEL TRUCK 1 ■ PICKUP TRUCKS 9 ■ LIGHT TOWERS 13 ' SITE MULE 3 ■ DUMP TRUCKS ' 10 WHEEL DUMP TRUCK DELAYS: ENTIRE JOB SHUT DOWN FOR 1 HOUR ■ FLASHING ARROW BOARD 1 DUE TO MEMORIAL SERVICE ■ OFFICE TRAILER/GENER. 1 ' CARGO BOXES 3 ■ FLAT TRUCK 1 ■ PUMP 2 ' ROLLER 1 ■ RAINMAKER/GENIE LIFT ■ 1

Description of Work:_________________________________________________________________ DELAYS 1200 DOWN 11 AM ALL DAY TO SEARCH FOR PORT AUTHORITY POLICE OFFICER LOAD OUT STEEL AND DEBRIS_____________________________________________________ MANNED TARPING AND TRIMMING STATIONS________________________________________ MANNED WATER STATIONS FOR DUST CONTROL____________________________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA______________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 INSTALLATION OF GPS SYSTEMS___________________________________________________ ELEVATIONS: ALL MACHINES LEVEL B-5 253_________________________________________ LOADS OUT 50 YUKELOADS 48 __ GRACE CONTRACT ;oi Approved By: Title:_______ For: SUPERINTENDENT

DAILY WORK FORCE REPORT 1211D.xls

CITY_21MC100_004752855

NYC-WTC_000278676

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000278676Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →