Day shift daily workforce and equipment listing for World Trade site, Dec 13, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗Night final daily workforce report listing equipment and labor at the World Trade Center site.
NYC-WTC_000278617OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. ■^45 6th Road. WWleitona. N.y. 11357-(718)767-9000 DATE: DECEMBER S, 2001 (NIGHT FINAL)
DAILY WORK FORCE REPORT i Job Name & Location; World Trade Center Contract No. Weather Conditions
, Labor Equipment CLASSIFICATION QUANT. Description. MANNED STANDBY IDLE! SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINE ER 1 CAT446 BACKHOE 1 OFFICE ENGINEER 1 CAT973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS .20 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACH11200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 10 MECHANICS TRUCK 1 1 MECHANICS 1' TOOL TRUCK 1 HOUSE WRECKERS 7 TOOL VAN ROLLOFF DUMP TRAILERS 7 LOW BED TRAILER HIGH DECK TRAILERS 2 WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 2 LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 i CARGO BOXES ~ 3 ’ flat truck 1 'PUMP ......... 2 'ROLLER 1 ' RAINMAKER/GENIE LIFT 1
Description of Work:__________________________________________________________________________________ , LOADS OUT; 26 DUMP TRAILERS/HIGH BEDS; 33 EUCLIDS LOAD OUT STEEL AND DEBRIS i MAN TARPING ANO TRIMMING STATIONS _________________________________________________ ■ : MAN WATER STATIONS FOR DUST CONTROL CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC'S ROADWAY; CONTINUE BURNING OF THE NORTH WALL COLUMNS " ............ • ELEVATIONS: ALL MACHINES LEVEL B-5 253 ^ELAYS^J^OT^i^^S^F^ACHiNESjNHOLEAPWOXiWEmHRFORFDNYrZZZZZZZ^ZZZZZZ^^ FREON RECOVERY FROM 7-10:30 PM, NO DUMP TRAILERS LOADED. GRACE CONTRACTJNG pORP Approved By: ITitle: “BY; SUPERINTEND^T
DAILY WORK FORCE REPORT 1206N.xls
CITY_21MC1OO_OO4688223
NYC-WTC_000278617
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000386652
Day shift daily workforce and equipment listing for World Trade site, Dec 13, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000361543
Night final daily workforce and equipment listing for World Trade Center site, Dec 8, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000408096
Final night shift daily workforce listing for World Trade Center project, December 10, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291379
December 5, 2001 night final daily work force report for World Trade Center site.
3 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000408090
Analytical- project report discussing subcontractor licensure and wage concerns; Safeway waste subcontracts.
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278685
Day shift daily workforce and equipment at World Trade Center, December 5, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305383
Night final daily workforce report for World Trade Center site, Dec 9, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280757
World Trade Center daily crew and equipment, Dec 4, 2001 (Night).
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278681
Daily workforce and equipment tallies for World Trade Center, December 8, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388372
Night shift daily workforce and equipment at World Trade site, Dec 6, 2001.
4 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000389476
Night final daily workforce and equipment, World Trade Center, Dec 5, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302472
Night preliminary daily workforce and equipment for World Trade site, Dec 19, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000386652
Day shift daily workforce and equipment listing for World Trade site, Dec 13, 2001.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000361543
Night final daily workforce and equipment listing for World Trade Center site, Dec 8, 2001.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000408096
Final night shift daily workforce listing for World Trade Center project, December 10, 2001.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291379
December 5, 2001 night final daily work force report for World Trade Center site.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000408090
Analytical- project report discussing subcontractor licensure and wage concerns; Safeway waste subcontracts.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278685
Day shift daily workforce and equipment at World Trade Center, December 5, 2001.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000386652
Day shift daily workforce and equipment listing for World Trade site, Dec 13, 2001.
Similar indexed content
NYC-WTC_000361543
Night final daily workforce and equipment listing for World Trade Center site, Dec 8, 2001.
Similar indexed content
NYC-WTC_000408096
Final night shift daily workforce listing for World Trade Center project, December 10, 2001.
Similar indexed content
NYC-WTC_000291379
December 5, 2001 night final daily work force report for World Trade Center site.
Similar indexed content
NYC-WTC_000408090
Analytical- project report discussing subcontractor licensure and wage concerns; Safeway waste subcontracts.
Similar indexed content