NYC-WTC_000305600
Final night daily workforce and equipment at World Trade Center site, December 2001.
1 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗Night final daily workforce and weather noted at World Trade site, Dec 10, 2001.
NYC-WTC_000278609OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. 151-45 6th Road, Whitestone^, N.Y, 11357-(718) 767-9000 DATE: MONDAY DECEMBER-10-01 FINAL NIGHT DAILY WORK FORCE REPORT
iJob Name & Location: World Trade Center Contract No. ' IWeather Conditions dVERCAST - MILD
Labor Il I Equipment : CLASSIFICATION [| QUANT. I Description MANNED STANDBY! IDLE SUPERINTENDENT 2 IICAT 966 LOADER 1 PROJECT ENGINEER i CAT 446 BACKHOE 1 OFFICE ENGINEER ; CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS. . I 17 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 _____ 5 HITACHI 550 GRAPPLER 1 LOCAL 15 I 8 HITACH11200 GRAPPLER 1 CARPENTER _____ 185 CFM COMPRESSOR 1 CARPENTER FOREMAN ■ 235 HAMMER HOE RAM 1 TEAMSTERS - FUEL TRUCK 1 ■ MECHANICS TRUCK 1 1 MECHANICS i 1 ■ TOOL TRUCK 1 HOUSE WRECKERS i 8 ■ TOOL VAN ■ ROLL OFF TRUCKING TEAMSTERS - BOVIS 22 ■ DUMP TRAILERS 21 TRUCKING TEAMSTERS 5 ■ LOW BED TRAILER ■ HIGH DECK TRAILERS 6 750 & 375 AT BOTTOM OF PIT LOADING OUT STEEL ■ WELDING TRUCK ONTO TULLYS EUKES & FLATS ■ FUEL TRUCK 1 ■ PICKUP TRUCKS 2 1200 ON WEST SLOPE FEEDING MATERIAL TO 365 ■ LIGHT TOWERS 13 WHICH LOADED OUR TRAILERS ■ SITE MULE 3 ■ DUMP TRUCKS 973 STOCKPILING LOOSE MATERIAL AT BOTTOM OF PIT ■ 10 WHEEL DUMP TRUCK ■ FLASHING ARROW BOARD 1 KIETH - GRACE MECHANIC INSTALLED GPS ON ■ OFFICE TRAILER/GENER. 1 5 TRUCKS - WORKED ON THIS UNTIL 12:45 AM ■ CARGO BOXES 3 ■ FLAT TRUCK 1 WE LOADED CUT 42 LOADS_____________________ “ PUMP 2 LOADED 42 OF TULLYS EUKES ___________ ■ ROLLER LOADED 24 Of- TULLYS FLATS " RAINMAKER/GENIE LIFT 1 84 LOADS WENT OUT FROM AMEC IN DOS TRUCKS Description of V/ork:
CONTINUE REMOVAL OF DEBRIS__________________ [MANNED TARPING STATIONS MANNED WATERING STATIONS FOR DUST CONTROL MAINTAIN TRA FFIC FLOW IN AND OUT OF AREA
GRACE CONTRACTING CORP Approved By; Title; BY: For; SUPERINTENDENT
DAILY WORK FORCE REPORT 1210N.xls
CITY_21MC100_004688215
NYC-WTC_000278609
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000305600
Final night daily workforce and equipment at World Trade Center site, December 2001.
1 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291296
Night final daily workforce report for World Trade site (Dec 10, 2001).
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419244
Final daily workforce and equipment summary for World Trade site, December 14, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000361473
Final daily workforce report for World Trade site with listed crew and equipment.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278677
Daily workforce and equipment list for World Trade Center site, December 10, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305204
Final daily workforce report for World Trade Center, December 10, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291294
Night final daily workforce report for World Trade site with conditions (Dec 11, 2001).
1 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280015
Night shift daily workforce and equipment listing for World Trade Center site, December 2001.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278981
Daily workforce and equipment counts for World Trade Center project; night shift.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278610
Day final daily workforce and equipment at World Trade site, Dec 10, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280097
FINAL night daily workforce and equipment summary for World Trade Center, Dec 10, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429727
Night final daily workforce and equipment at World Trade Center, Dec 11, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000305600
Final night daily workforce and equipment at World Trade Center site, December 2001.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291296
Night final daily workforce report for World Trade site (Dec 10, 2001).
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419244
Final daily workforce and equipment summary for World Trade site, December 14, 2001.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000361473
Final daily workforce report for World Trade site with listed crew and equipment.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278677
Daily workforce and equipment list for World Trade Center site, December 10, 2001.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305204
Final daily workforce report for World Trade Center, December 10, 2001.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000305600
Final night daily workforce and equipment at World Trade Center site, December 2001.
Similar indexed content
NYC-WTC_000291296
Night final daily workforce report for World Trade site (Dec 10, 2001).
Similar indexed content
NYC-WTC_000419244
Final daily workforce and equipment summary for World Trade site, December 14, 2001.
Similar indexed content
NYC-WTC_000361473
Final daily workforce report for World Trade site with listed crew and equipment.
Similar indexed content
NYC-WTC_000278677
Daily workforce and equipment list for World Trade Center site, December 10, 2001.
Similar indexed content