NYC 9/11 Public Portal Document
o GRACE CONTRACTING CORP. 151-45 611180311, Whitestone, N.Y, 11367- (718) 76715000 DATE: MONDAY, NOVEMBER 26, 2001 DAY (FINAL)
DAILY WORK FORCE REPORT
__________________________________ 1____________ Job Name & Location; World Trade Center Contract No. ' Weather Conditions RAIN EARLY THEN MILD - DARK
Labor Equipment CLASSIFICATION UANTIT I Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER 1 CAT 375 GRAPPLER 1 LABORERS 20 HITACHI 750 GRAPPLER 1 IRONWORKERS 1 HITACHI 550 GRAPPLER 1 LOCAL 14 4 HITACHI 550 GRAPPLER 1 LOCAL 15 9 HITACHI 1200 GRAPPLER 1 CARPENTER 135 CFM COMPRESSOR 1 CARPENTER FOREMAN 2 MECHANICS TRUCK 2 TEAMSTERS 11 TOOL TRUCK 1 MECHANICS 2 TOOL VAN 1 HOUSE WRECKERS 4 ROLL OFF DUMP TRAILERS 8 LOW BED TRAILER HIGH DECK TRAILERS 2 WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 5 LIGHT TOWERS 8 PARTS TRUCK 1 ■ DUMP TRUCKS ■ 10 WHEEL DUMP TRUCK ■ FLASHING ARROW BOARD 1 ■ OFFICE TRAILER 1 ■ CARGO BOXES 3 ' FLAT TRUCK 1 ■ PUMP 2 ■ 85' FOOT GENIE 1 ' ANGEL AERIAL(DUSTSUPR 1 ' GENERATOR 60KW 1
Description of Work:_________________ L_____________________________________ LOADS OUT: 140___________________ i____________________ EXCAVATING ALONG WEST SLURRY WALL SOUTH OF OUR ACCESS ROAD_________________ CONTINUED BUIDING RAMP FROM NORTHWEST APPROACH _____________________ ____________ MANNED TAFtPING AND TRIMMING STATIONS MANNED WATER STATIONS FOR DUST CONTROL_________________________________ MAINTAIN TRAFFIC FLOW IN AND OUTjOF AREA__________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2_________________ DELAYS: 1 HR (12:00-1:00) WHILE CR^W WENT UNDERGROUND TO INVESTIGATE AREA____________ 3 HOURS WITH GATEWAY 550 & GRAPE 750 AT N/E CORNER OF TOWER 2 CORE WHILEiSEARCH AND RECOVERY FOR FIREFIGHTERS WAS CONDUCTED
GRACE CONTRACTING CORP Approved By: 'Title: BY: For: SUPERINTENDENT
CITY_21MC100_004688192
NYC-WTC_000278589
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000429737
Asbestos fiber analysis result from WTC area NW of Bankr, Jan 2002.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302422
Night shift daily workforce report for World Trade Center project with equipment list.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305580
Night shift daily workforce and equipment at World Trade site, Dec 1, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305599
Day daily workforce and equipment at World Trade Center site, December 2001.
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278997
Daytime daily workforce and equipment at World Trade site, December 6, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388353
Daily workforce report with crew counts and equipment at World Trade during Nov 2001.
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000389393
Daily workforce report for World Trade project, listing personnel and equipment.
2 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000408073
Final daily labor/equipment report for World Trade Center, Nov 26, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000266915
Day shift daily workforce report for World Trade Center project.
2 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305374
Day shift final daily workforce report for World Trade Center site, Dec 5, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305433
Daily labor and equipment roster for World Trade Center site, November 26, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305052
Daily workforce and equipment record for World Trade Center site, December 2001.
2 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000429737
Asbestos fiber analysis result from WTC area NW of Bankr, Jan 2002.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302422
Night shift daily workforce report for World Trade Center project with equipment list.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305580
Night shift daily workforce and equipment at World Trade site, Dec 1, 2001.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305599
Day daily workforce and equipment at World Trade Center site, December 2001.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278997
Daytime daily workforce and equipment at World Trade site, December 6, 2001.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388353
Daily workforce report with crew counts and equipment at World Trade during Nov 2001.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000429737
Asbestos fiber analysis result from WTC area NW of Bankr, Jan 2002.
Similar indexed content
NYC-WTC_000302422
Night shift daily workforce report for World Trade Center project with equipment list.
Similar indexed content
NYC-WTC_000305580
Night shift daily workforce and equipment at World Trade site, Dec 1, 2001.
Similar indexed content
NYC-WTC_000305599
Day daily workforce and equipment at World Trade Center site, December 2001.
Similar indexed content
NYC-WTC_000278997
Daytime daily workforce and equipment at World Trade site, December 6, 2001.
Similar indexed content