Daily work force report, World Trade Center, Nov 26, 2001

Machine-extracted title · confidence 34%

Daily workforce and equipment listings for World Trade Center site, Nov 26, 2001 (Day).

NYC-WTC_000278589
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

o GRACE CONTRACTING CORP. 151-45 611180311, Whitestone, N.Y, 11367- (718) 76715000 DATE: MONDAY, NOVEMBER 26, 2001 DAY (FINAL)

DAILY WORK FORCE REPORT

__________________________________ 1____________ Job Name & Location; World Trade Center Contract No. ' Weather Conditions RAIN EARLY THEN MILD - DARK

Labor Equipment CLASSIFICATION UANTIT I Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER 1 CAT 375 GRAPPLER 1 LABORERS 20 HITACHI 750 GRAPPLER 1 IRONWORKERS 1 HITACHI 550 GRAPPLER 1 LOCAL 14 4 HITACHI 550 GRAPPLER 1 LOCAL 15 9 HITACHI 1200 GRAPPLER 1 CARPENTER 135 CFM COMPRESSOR 1 CARPENTER FOREMAN 2 MECHANICS TRUCK 2 TEAMSTERS 11 TOOL TRUCK 1 MECHANICS 2 TOOL VAN 1 HOUSE WRECKERS 4 ROLL OFF DUMP TRAILERS 8 LOW BED TRAILER HIGH DECK TRAILERS 2 WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 5 LIGHT TOWERS 8 PARTS TRUCK 1 ■ DUMP TRUCKS ■ 10 WHEEL DUMP TRUCK ■ FLASHING ARROW BOARD 1 ■ OFFICE TRAILER 1 ■ CARGO BOXES 3 ' FLAT TRUCK 1 ■ PUMP 2 ■ 85' FOOT GENIE 1 ' ANGEL AERIAL(DUSTSUPR 1 ' GENERATOR 60KW 1

Description of Work:_________________ L_____________________________________ LOADS OUT: 140___________________ i____________________ EXCAVATING ALONG WEST SLURRY WALL SOUTH OF OUR ACCESS ROAD_________________ CONTINUED BUIDING RAMP FROM NORTHWEST APPROACH _____________________ ____________ MANNED TAFtPING AND TRIMMING STATIONS MANNED WATER STATIONS FOR DUST CONTROL_________________________________ MAINTAIN TRAFFIC FLOW IN AND OUTjOF AREA__________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2_________________ DELAYS: 1 HR (12:00-1:00) WHILE CR^W WENT UNDERGROUND TO INVESTIGATE AREA____________ 3 HOURS WITH GATEWAY 550 & GRAPE 750 AT N/E CORNER OF TOWER 2 CORE WHILEiSEARCH AND RECOVERY FOR FIREFIGHTERS WAS CONDUCTED

GRACE CONTRACTING CORP Approved By: 'Title: BY: For: SUPERINTENDENT

CITY_21MC100_004688192

NYC-WTC_000278589

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000278589Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →