2.A.L Building Condition
After the World Trade Center (WTC) attack, both Cedar Street and Liberty Street were closed to
traffic. Tenants were not permitted to enter the building. EPA, other governmental officials, and
the building owner had been the only authorized individuals to enter the building since
September 11, 2001. Presently, the residential spaces of the building are being re-occupied. The
New York City Building Department inspected the building for structural integrity prior to
mobilization to the site.
Shortly after the collapse of the WTC, the building was professionally cleaned by the building
owner, Liberty Street Associates, LLC. However, the cleanup was limited to the residential
units, the common areas, the basement, the roof, and the Baldwin Realty Company office. None
of the other commercial spaces had been cleaned. Although professionally cleaned prior to
implementation of the Study, there had been redeposition of dust that had become airborne
during the cleaning and removal of WTC-related debris. At project assignment, the
Chiropractor's Office and the Retail Mattress Showroom were covered with inches of dust. The
New York City Fire Department cleaned these units just prior to commencement of the Study, as
part of the recovery operation. Prior to cleaning, each unit was inspected and photographed to
document its condition and contents.
At project onset, the units were in varying conditions. Some units had experienced significant
impact by dust and debris as a result of the WTC attack. Other units evidenced minimal dust and
debris related to the WTC incident. The units facing Liberty Street contained a larger quantity of
dust than those facing Cedar Street. All of the residential and commercial units contained
re-deposit of dust generated by the work effort at Ground Zero. The deposition of dust appeared
to be dependent on the location of the unit with respect to its orientation to ground zero and the
degree of damage it incurred during and after the collapse. Although the building had been
previously cleaned and entrance doors and broken windows facing Liberty Street had been
secured with plywood, they were not secured in a manner that would seal them to prevent the
reentry of dust that was being generated during the debris removal operations. Likewise
skylights located on the top floors of the building had been damaged and also offered a pathway
for dust to migrate into the building. These conditions existed during most of the recovery effort.
2.A.2. Building Contents
All of the residential rental units contained personal possessions. Some units were fully
furnished and contained numerous personal possessions, others contained few furnishings and
personal possessions. The commercial units contained property customarily found in those types
of business establishments. For example, the Retail Mattress Store contained a display of
twenty-five box springs and mattresses. The restaurants contained dining room tables, chairs,
food preparation equipment and food.
Prior to commencement of cleaning operations, each of the tenants were contacted to schedule
appointments to determine the tenants' wishes relative to the disposition of their belongings. At