NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 414 pages

Ground Zero environmental health schools report

Machine-extracted title · confidence 45%

Document discussing lessons learned in children's environmental health related to Ground Zero sites.

NYC-WTC_000276036–000276449
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Gawlowicz Nancy From: [email protected] Sent: Tuesday, December 11, 2001 9:02 PM To: Collins Charles Cc: [email protected]: [email protected]; [email protected] Subject

Meeting of 12-11-01 Awl industries was renu^^ to purchase two Rupp ENV-12 units to provide booster fan capacity and filtering to the Kindergarten rooms^^fl^^ and the Choral room at SHS.

Units are rated at 2HP and 2550 cfm Filtering consists of 1 4" pleat 30%, 1 95% bag filter, 1 carbon 25 lb, and an additional 1 2" pleat 30% Burns and Roe conf( ^raous ad Michael Parpounas of ATC about the merits of adding portable air cleaners for the vestibules of( ■ and SHS. ATC will review the c ;ted and will confer with Bernard Orlan of the NYC Bd, of ED. It was proposed to consider these air cleaners but ambjent noise may be a problem.

ATC and Burns and Roe reviewed the testing of the Unit Ventilators outside air filtration system. It was agreed to select 4 classrooms on the Sth floor of SHS on both the North and South side of the building. Classrooms are proposed to be tested with the original filter, one 4 ply pleated, two 4 ply pleated, and the electrostatic filter proposed by McQuay. ____ Burns and Roe obtained the serial numbers of the unit ventilators in^Biand will e-mail to McQuay. McQuay will be requested to provide a mock up test filter unit for testing over the Christmas holiday. Burns and Roe requested WRL to provide a schedule for SHS ancBflb- Air balance testing is completed at SHS for the interior units. To expedite testing of the 6 rooftop units face velocity readings of the units coil will be accepted. It is not possible to provide traverse readings at the roof level and lifts would be required to traverse the ducts at the ceilings of the gym, auditorium, etc.

Burns and Roe and WRL will review the ceiling mounted UV units and the modifications of the rooftop units for extra filtration on Thursday after the PS89 meeting. Robert S. Cascone, P.E.

CITY_21MC100_012173006

NYC-WTC_000276161

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000276161Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000106411 · Box DEP Box 37

Union memorandum regarding environmental monitoring and cleanup protocols following the closure of Stuyvesant High School after the September 11 attacks.

Similar indexed content

NYC-WTC_000149798 · Box DEP Box 10

Generic form or header page from the Department of Environmental Protection regarding general World Trade Center notices and requests.

Similar indexed content

Compare copies and versions →