Daily work force report, 151-45 6th Rd, Dec 2001

Machine-extracted title · confidence 46%

Day final daily workforce roster for World Trade site listing personnel and equipment.

NYC-WTC_000269235
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 6Ui Road, WhitMtone, N.Y. 11357-(718) 767-8000 DATE: 12/30/01 DAY FINAL

DAILY WORK FORCE REPORT

Hjob Name & Location: World Trade Center Contract No. Weather Conditions

Labor Equipment CLASSIFICATION QUANT. _______ Description______ MANNED STANDBY! IDLE! SUPERINTENDENT CAT 966 LOADER 1 PROJECT ENGINEER CAT 446 BACKHOE_____ 1 OFFICE ENGINEER CAT 973 LOADER______ ___L_ foremen 2 CAT 365 GRAPPLER 1 [safety officer _1_ CAT 375 GRAPPLER 1 LABORERS 27 CAT 375 GRAPPLER MANNED BY gateway IRON WORKERS HITACHI 750 GRAPPLER 1 LOCAL 14 HITACHI 550 BUCKET 1 LOCAL 15 5 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN £ 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK 1 HOUSE WRECKERS 9 TOOLVAN____________ ROLLOFF____________ DUMP TRAILERS LOW BED TRAILER DELIVERIES: [[high DECK TRAILERS ~ WELDING TRUCK ~ 1 FUEL TRUCK 1 1 PICKUP TRUCKS . 1 1 LIGHT TOWERS 13 (SITE MULE ~ 3 [DUMP TRUCKS 'll 0 WHEEL DUMP TRUCK~ 'IflASHING arrow BOAf^ 1 'lloFFlCE TRAILER/GENER~ 1 ICARGO BOXES ~ 3 [[flat TRUCK ~ [(pump 2 ’(ROLLER ~ ■rrainmaker/genie lift 1

Descfipiion of Work:________________________________________________________________ COMPLETED WORK_____________ ______________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 ANO SOUTH OF MAIN CHILLER PLANT MAN WATERING STATIONS FOR DUST CONTROL____________________________________________ MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA___________________________________________ 3 MACHINES AT LEVELS B-5, ONE MACHINE AT LEVEL B-6: EL 242_______________________________ LOADS OUT:_____________________________________________ _ _________________________ YOKES OUT;

GRACE CONTRACTING CORP| Approved By: BY: Title: For: SUPERINTENDENT

DAILY WORK FORCE REPORT1230D.xls

CITY_21MC1OO_OO5O2O278

NYC-WTC_000269235

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000269235Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000280001

Night shift labor and equipment at World Trade Center, Grace Contracting, December 5, 2001.

Similar indexed content

NYC-WTC_000280005

Night shift labor and machinery at World Trade Center, December 4, 2001.