Daily work force report, World Trade Center, Dec 7, 2001

Machine-extracted title · confidence 42%

Night shift daily workforce with equipment allocations for World Trade Center site.

NYC-WTC_000269184
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 Wh Road, WWteitone, N.Y. 11357-(718) 787-9000 DATE. DECEMBER 7. 2001 (NIGHT PRELIMINARY) 8:00 PM DAILY WORK FORCE REPORT

Job Name & Location; World Trade Center Contract No. Weather Conditions

Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 1 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 17 HITACHI 750 GRAPPLER T IRON WORKERS HITACHI 550 GRAPPLER LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACH11200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 7 CARPENTER FOREMAN 1235 HAMMER HOE RAM 1 TEAMSTERS 11 ImECHANICS TRUCK 1 1 MECHANICS 1 ITQOL TRUCK 1 HOUSE WRECKERS 5 HTOOL VAN IrOLL OFF IIdUMP TRAILERS 7 LOW BED TRAILER HIGH DECK TRAILERS 2 WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 2 LIGHT TOWERS 13 SITE MULE 3 DUMPTRUCKS 10 WHEEL DUMP TRUCK ■ FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK 1 PUMP 2 ROLLER 1 RAINMAKER/GENIE LIFT 1 I Description of Work: ______ __________________________________________________________ PRELIMINARY WORK / ANTICIPATED _______________________________________________________ LOAD OUT STEEL AND DEBRIS__________________________________________________________________ MAN TARPING AND TRIMMING STATIONS_________________________________________________________ MAN WATER STATIONS FOR DUST CONTROL______________________________________________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA____________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC’S ROADWAY CONTINUE BURNING OF THE SW CORNER COLUMN BEAMS___________________________________________ ELEVATIONS: ALL MACHINES LEVEL B-5 253

GRACE CONTRACTING CORP Approved By: TiUe: SUPERINTENDENT 1 For;

DAILY WORK FORCE REPORT 1207N.xls

CITY_21MC10 0_0 0 0Cll998 6 NYC-WTC_000269184

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000269184Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000280005

Night shift labor and machinery at World Trade Center, December 4, 2001.

Similar indexed content

Compare copies and versions →