NYC 9/11 Public Portal Document
SEP-28-01 FRI 03:30 PH RHKP FAX NO. P, 02/iO
SEP-28-Ol FRI 02:3^ PH AMBIENT GROUP I’NC FAX NO, 212 788 1540 P. 02
ZAR REALTY
100 CHURCH STREET
NEW YORK, NY
SETTLED DUST BULK SAMPLING RESULTS
September 28, 2001
FlO'Or/ /I OF areasREEding SQUARE FEET
ievei. HULKS ASBESTOS cleanup OF AREA (SF) REMARKS
■.Sdb-TellT/" 0 Area Not Accessible. No samples. NA Level Flooded
Cellar
------------ Engine room and all areas witfi dust 30,000
12 Dept of Labor'(Soutli West side) "“"W
Lobby Area @ Front Entrance 2,000
Mezzanine 1 South West Comer___________ 4,000
2T~“ NO WORK ON THIS FLOOR NA All samples negative
...... nOwork on this floor NA All aainplfts iiegativo
------ 'NO WORK ON iHlSflook NA All samjsles negative
19 "WW'ORICSN TOIS FLOOR All samples negative
- .ym -r .7" ”
f9 ' TPonh East Side — “ 2,000
"12 ‘ Entire Office Space of Floor “ 42,000
MER-FrcaH air Intake/Plenum 1,300 Including all filters
18 East Side of Floor 8,000
North East Comer 4,000
"gnt.... iiO'WORKQN'THlS FLOOR RT All xamples negative
-jqIK 10 ' Sou'll Wert Comer ~ ~ ‘3,000
“11 12 “South West Comer___________ " liooT
1T’“‘....... nr South West Corner 6,000
1T“ "sWi East Side of Core Area 2,000 Fire Door w/ACM
... _zii: ~ No WOkK'OITTRls floor NA All samplis negative
10 ToutlTCcnlral Side of Core Area “Wo Fire Door w/ACM
NO WORK ON THIS FLOOR "NA All samples negative
-j-jTir—•
“IT" NO WORK ON THIS FLOOR ‘All sampl^cgative -
17 South West Side Wo Two locations
-jqytK--- " “14 South West Side
East Side 3,000
2?' / .....
Penthouse 8 Rest Roonr-Nortli West Comer 2S0
MERs 19 Abandoned Unit (DC-2) 100 Remaining areas of the
(Last and East and West Fan
West side) ■ Rooms-all samples
negative
Tcofs 5 AJlexposed hoHzonUl surfaces and Roof Areas; 54,000 Based on footprint of"
(20'^ Find all exterlnr ledges on fa9ad6. Also building ar.d all
nbovc) roof entrances into building. facades: 230,000 facades.
TOTALS; 324 Interior; 121,650
Roof Areas; $4,000
Facades; 230.000
GRAND TOTAL; 405,650
NOTES:
1. Quantity of affected areas pci area per floor to be cleaned Is approximate. Final determination to be
ittade in field with Engineer,
2. Air niters In all Air Handling equipment are to be removed and disposed as contaminated debris,
Cowdinatc with Building Engineer for exact locations of units.
3. All other areas of respective floors, in which bulk samples tested negative for the presence of asbestos,
cleanup can proceed as nou-asbestos project
4. Qn floors with noii-ACM and ACM areas coordinate with Building Management. Recommend that all
ACM cleamipa be completed prior to general cleanup.
211334
CITY_21MC100_000104269
NYC-WTC_000268577
OCR can misread numbers and units. Confirm readings against the page image before using them.