NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 3 pages

FEDERAL EMERGENCY MANAGEMENT AGENCY project data

Machine-extracted title · confidence 37%

FEMA disaster project data for New York City Education Board site remediation and SCA work.

NYC-WTC_000267441–000267443
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

Z FEDERAL EMERGENCY MANAGEMENT AGENCY Z ■< Date: 07/17/2002 ■<

o Project Completion and Certification Report (P.4) o co g Disaster #:1391 o I “0 o c o CT o P.A. ID: 061-51000-22 Applicant: NEW YORK / EDUCATION, BOARD OF EDUC ro o' cn "0 PW# VSN PKG# INF Cat Work Projected Approved PW % Actual Date Amt. Claimed Comments o Done By Compl. Date Amt. Compl. Completed by Applicant Ca5 at Insp. o o 732 0 45 N E 03/11/2003 $1,307,576.76 100% $ o c 3 SITE NUMBER: 1 FACILITY NAME : NYC BOARD OF EDUCATION CD 3 LOCATION 201 WARREN STREET, NEW YORK10282 SCOPE OF WORK WORK COMPLETE CONSISTS OF THE EXPENSES INCURRED BY THE NEW YORK CITY, BOARD OF EDUCATION (BOE) FOR THE WORK PERFORMED BY THE SCHOOL CONSTRUCTION AUTHORITY (SCA). SCA WILL BE SUBMITTING ALL COSTS TO THE BOE FOR REIMBURSEMENT. THESE COSTS INCLUDE THE CONTRACTUAL WORK FOR REMEDIATION AND RESTORATION OF PS/IS 89 ON THE BASIS OF DESIGN, CAPACITY AND FUNCTION OF THE FACILITY PRIOR TO THE DISASTER AND IN CONFORMITY WITH APPLICABLE STANDARDS. SCHOOL CONSTRUCTION AUTHORITY WAS RESPONSIBLE FOR THE COORDINATION AND CONSTRUCTION MANAGEMENT OF THE CONTRACTORS PERFORMING WORK AT PS/IS 89 RELATED TO THE COLLAPSE OF WTC. COSTS ASSOCIATED WITH THE WORK PERFORMED BY SCA CONSISTS OF REGULAR TIME LABOR ($2,139.05), INCLUDING THE NEW YORK CITY REGULAR TIME FRINGE BENEFIT RATE FOR NON-UNIFORM EMPLOYEES OF 44.66% ($955.30). TOTAL INCURRED COST FOR REGULAR TIME LABOR IS $3,094.35. COSTS ASSOCIATED WITH THE OVERTIME FOR LABOR FOR SCA ($6,030.13), INCLUDING THE NEW YORK CITY OVERTIME FRINGE BENEFIT RATE FOR NON-UNIFORM EMPLOYEES OF 10.73% ($647.04). TOTAL INCURRED COST FOR OVERTIME LABOR IS $6,677.17. SCA RETAINED 6 SUBCONTRACTORS TO PERFORM DUTIES NECESSARY TO REMEDIATE AND RESTORE PS/IS 89 TO ITS PRE-DISASTER CONDITION. AIR TECH LAB. INC. (AIR TECH) PERFORMED CLEAN UP AND REMEDIATION OPERATIONS OF THE INTERIOR OF THE BUILDING. CORINTHIAN CONSTRUCTION COMPANY. INC. ( CORINTHIAN) CLEANED DEBRIS AND DUST FROM THE EXTERIOR FACADE. ROOF. THE COURTYARD AND PLAYGROUND. IN ADDITION. CORINTHIAN REMOVED GRAVEL FROM THE ROOF. THE ROOF MEMBRANE WAS THEN PRESSURE WASHED. AND NEW GRAVEL WAS PLACED ON THE ROOF. V&R MECHANICAL INC. (V&R) CLEANED THE HVAC SYSTEM OF DUST AND DEBRIS. ATC ASSOCIATES. INC. (ATC) CONDUCTED QUALITY CONTROL AIR MONITORING AND ANALYTICAL SERVICES, AS WELL AS VISUAL INSPECTIONS TO DETERMINE THE PRESENCE OF FINE PARTICULATE DUST. NEW YORK ENVIRONMENTAL CONDUCTED AGGRESSIVE SAMPLING AND TRANSMISSION ELECTRON MICROSCOPY (TEM) ANALYSIS OF SEVERAL FLOORS AND TH SCOPE OF WORK HVAC UNIT. TDX CONSTRUCTION CORPORATION (TDX) PERFORMED CONSTRUCTION OVERSIGHT OF ALL CONTRACTUAL ACTIVITIES TO INSURE QUALITY OF WORK. TOTAL CONTRACTUAL COSTS SUBMITTED TO BOE FROM SCA FOR THIS PROJECT WORKSHEET IS $1,297,805.24. SEE NARRATIVE FOR DETAILED DESCRIPTION OF THE WORK PERFORMED BY SCA AND EACH CONTRACTOR, AS WELL AS THEIR RESPECTIVE COSTS. TOTAL COSTS ASSOCIATED WITH THIS PROJECT WORKSHEET FOR CONTRACTUAL WORK AND LABOR IS $1,307,576.76.

o Total for 3 PWs $4,093,112.81 $ Subgrantee Admin: $20,465.57 Grand Total; $4,113,578.38 to

S o o o I o CERTIFICATION o I HEREBY CERTIFY THAT TO THE BEST OF MY KNOWLEDGE AND BELIEF I CERTIFY THAT ALL FUNDS WERE EXPENDED IN ACCORDANCE O ALL WORK AND COSTS CLAIMED ARE ELIGIBLE IN ACCORDANCE WITH THE WITH THE PROVISIONS OF THE FEMA-STATE AGREEMENT AND CO CO Page 3 of 3 CO

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000267443Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

FEMA application summary, 1391

NYC-WTC_000279710

Project application summary for FEMA disaster 1391; reveals site and cost figures.

Similar indexed content

NYC-WTC_000411638

FEMA project summary for PS 234 site mitigation and cost reimbursement.

Similar indexed content

Compare copies and versions →