Daily work force report, World Trade Center site

Machine-extracted title · confidence 58%

Day final daily workforce and equipment for World Trade Center construction.

NYC-WTC_000267324
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. l5MS6th Road. Whitestone. N.Y. 11357-(718) 767-9000 DATE: 1/22/02 DAY FINAL

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 2 CAT 973 LOADER 1 OFFICE ENGINEER CAT 365 GRAPPLER 1 FOREMEN 1 CAT 375 GRAPPLER 1 SAFETY OFFICER 1 CAT 375 GRAPPLER 1 LABORERS 8 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 1200 GRAPPLER 1 LOCAL 15 5 185 CFM COMPRESSOR 7 CARPENTER 235 HAMMER HOE RAM 1 CARPENTER FOREMAN 1 MECHANICS TRUCK 2 TEAMSTERS (FUEL) 1 TOOL TRUCK MECHANICS 2 TOOLVAN________ _ 1 HOUSE WRECKERS 6 ROLL OFF DUMP TRAILERS 5 LOW BED trailer HIGH DECK TRAILERS 1 WELDING TRUCK 1 DELIVERIES: AWISCO FUEL TRUCK 1 AUSTER PICKUP TRUCKS 8 LIGHT TOWERS 5 SITE MULE 2 •NOTE: WrC TRUCKING 10 DRIVERS DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD OFFICE TRAILER/GENER. 1 CARGO BOXES 4 FLAT TRUCK 1 PUMP 2 LIGHT TOWERS USED 2.5 HOURS RAINMAKER/GENIE LIFT

Description of Work:________ _____ _______ _______________________________ _ ANTICIPATED WORK______________ _____________________________________ ______________ ___ CONTINUE removing DEBRIS FROM LOWER LEVELS OF TOWER TWO TO ACCOMMODATE BRIDGE MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA LOADS OUT 61 YUKE LOADS 140

DELAYS: 1.5 HOURS DUE TO FDNY RECOVERY OF PA OFFICER. 45 MINUTES DUE TO ESCORT OF OFFICER

GRACE CONTRACTING CORP Approved By: Title:_______ For: SUPeRlNTENDENT

DAILY WORK FORCE REPORT0122D.xls

C:iTY_21MC:i00_001506449 NYC-WTC_000267324

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000267324Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000407315

Daily workforce report listing personnel and equipment for World Trade Center site, Jan 22, 2002.

Similar indexed content

Compare copies and versions →