Proposal
Date: May 7,2002_______________ _
JCC CONSTRUCTION CORP. To: BOVIS/AMEC ALLIANCE
24-02 39TH AVENUE 200 VESSEY ST.- 30TH FLOOR
LONG ISLAND CITY, NY 11101 City, State, Zip: NEW YORK, NY 10009
PHONE; (718)482-9600 Attention: MR. LEONARD BARONE-PROJ. M
FAX;(718)482-16)6 Project name: WORLD TRADE CENTER
RECOVERY
We propose to furnish all material and perform all labor necessary to complete the following;
1- Remove and replace sand in playground area.
3. Remove and replace sand in volleyball conn area.
3. Remove top 6" of soil in bocce coun area,
4. Replace damaged railing along pier 25. Remove and replace all wood top handrails, power wash entire railing and replace
damage curb as needed.
5 Excavate and remove temporary asphalt roadway. Excavate and remove all gravel under temporary roadway. Excavate and
and remove of soil beneath gravel to elevation equal to bottom of the adjacent paving stone (between N. Moore St, & School).
6. Remove debris, patch as needed bike path. Paint lines as required to match tire existing bike path.
■ Elirtunatc all power washing.
ALTERN.4TES
I' 1.) Adjust utiliry frame and cover total 11 @S 4,000.00 ea.
2.) Water for dust control not included.
3.) Asphalt restoranon or patching not included.
4.) Payment and Performance bond is not included in the base bid price.
I
We propose to furnish material and labor, complete in accordance with above specifications, for the
suinof£T2^rxcHiindredNinetySeyenThousandtwoHundredDoUnrs&NoCents^(S397200^0^
Payments to be made as follows:
Concractor's signature: David Cannizzaro/President
Acceptance of propo.sal - The above price, specifications and conditions are satisfactory and are
hereby accepted. You are authorized to do the work as specified. Payment will be made as
outlined above.