Daily work force report, World Trade Center day

Machine-extracted title · confidence 37%

Day shift daily workforce report for World Trade Center project.

NYC-WTC_000266917
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 6lh Road. Whitestone, N.Y. 11357-(718) 767-9000 DATE: DECEMBER 5.2001 (DAY) FINAL DAILY WORK FORCE REPORT

pob Name & Location: World Trade Center Contract No. Weather Conditions

Labor i| Equipment CLASSIFICATION QUANT. ]| Description MANNED SUPERINTENDENT 1 [CAT 966 LOADER ~ 1 PROJECT ENGINEER 2 ■ CAT 446 BACKHOE 1 [OFFICE ENGINEER ■ CAT 973 LOADER 1 FOREMEN 1 ■ CAT365GRAPPLER 1 SAFETY OFFICER 1 ■ CAT375GRAPPLER ■1__ LABORERS 24 ■ HITACHI 750 GRAPPLER 1 IRON WORKERS 1 ■ HITACHI 550 GRAPPLER 1 LOCAL 14 4 ■ HITACHI 550 GRAPPLER 1 LOCAL 15 8 ■ HITACHI 1200 GRAPPLER 1 IICARPENTER 1 ■ 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 ■ 235 HAMMER HOE RAM 1 TEAMSTERS 11 ■ MECHANICS TRUCK 2 MECHANICS 2 ■ TOOL TRUCK 1 HOUSE WRECKERS 7 ■ TOOL VAN 1 ■ ROLL OFF ■ DUMP TRAILERS 7 ■ LOW BED TRAILER DELIVERIES: AWISCO ■ HIGH DECK TRAILERS 3 ABCO ■ WELDING TRUCK 1 ■ FUEL TRUCK 1 [IPICKUP TRUCKS ~ 8 ■ LIGHT TOWERS 13 ■ SITE MULE 3 ■ DUMP TRUCKS ■ 10 WHEEL DUMP TRUCK ■ FLASHING ARROW BOARD 1 ■ OFFICE TRAILER/GENER. 1 ■ CARGO BOXES 3 ILIGHT TOWERS USED FOR 2.5 HOURS ■ FLAT TRUCK 1 ‘ PUMP 2 ■ ROLLER 1 ■ RAINMAKER/GENIE LIFT 1

Description of Work: DELAYS: 2:30-4:00 PM ALL WORK STOPPED______________________________________________________________ LOAD OUT STEEL AND DEBRIS_________________________________________________________________________ MANNED TARPING AND TRIMMING STATIONS____________________________________________________________ MANNED WATER STATIONS FOR DUST CONTROL_________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA______________ ____________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC'S ROADWAY CONTINUE BURNING OF THE SW CORNER COLUMN BEAMS ELEVATIONS: ALL MACHINES LEVEL B-5 253 LOADS OUT 53 YUKE LOADS 35 GRACE CONTRACTING CORP^ ( 7 Approved By: Title: For: SUPERINTENDENT .

DAILY WORK FORCE REPORT 1205D.xls

NYC-WTC_000266917 CITY_21MC100_001571559

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000266917Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →