Emergency clean-up operations plan, Maiden Lane, Mar 1998

Machine-extracted title · confidence 28%

Emergency asbestos clean-up plan for Maiden Lane site; access controls and containment setup.

NYC-WTC_000266119
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

MaT--25-9S 12:33 AIA ENVIRONMENTAL 718 545 6102 P . 02

AU ENVIRONMENTAL 0 20-29 38TH STREET ASTORIA. NEW YORK 11105 TEL: (718) 545-0000 PAX: (718) 545-6102 March 25, 1998

EMERGENCY CLEAN-UP OPERATIONS W 80 maiden lane associates 80 MAIDEN LANE, NEW YORK, NEW YORK Localion: 25"’ Floor, Electrical Closet, Mechanical Equipment Room, Janitors Closet, and Stairwell

The intent of this program is to clean up asbestos-containing debris. This program has been prepared based on a conversation w.th the NYCDEP on March 24, 1998. Following an inspection of the affected site, this program will follow the guidelines delineated below;

I. The areas in question will he isolated to the general public. Only cenified asbestos personnel .shall have access to the area.

2. A three-stage remote decontamination facility shall be constructed outside of the work area.

3. Asbestos personnel in suits and half face negative air pressure respirators shall perform all asbestos emergency clean-up operations in accordance with the NYC Title 15 Rules and Regulations.

4. Certified personnel shall clean all debris on the floors including a.sbcsios debris and other debris surrounding the effected area. Materials shall he placed in 6 mil polycihylcnc plastic bags properly labeled, double bagged and disposed as asbestos waste.

5. Air sampling shall be performed during work periods by an independent third party air monitor.

6 With the completion of the work, air sampling on the floor shall he performed via Phase Contrast Microscopy (PCM), The acceptable clearance standard .shall be established as 0.010 fibers per cubic cenlimclcr (f/co). Once this level has been achieved, the floors will be released to the building owner. Air sample results shall be provided to the NYCDEP at the completion of the work.

7.The amounts that are to be removed arc: 3 Linear Feet of pipe, 6 Square Feet of ACM Debris

8. All New York City Rules and Regulations from Title 15 will be followed as requested by the a NvcDRp, n

Wc anticipate the work being-performed starts on March 25, 1998 at 6:00 p,m..

C ITY_D E P_W0 RB Y_C AN N ATA_SUB P_000131373

NYC-WTC_000266119

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000266119Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →