NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premise No. Inspection Date:
130 Liberty Street 12/20/08
Floor ;Zip Borough Block Lot Squad # Badge #
Various_________ 10006 1 54 1 1 A062
Inspector Building Type Basis of Inspection Photos Taken
M.Gagnidze F TRU0086MN08 yes
Contractor’s Name Sample Number
LVI Environmental
Address City Sample Number
State Zip Phone Sample Number
Laboratory Name Owner's Name
TRC Environmental Corp The Lower Manhattan Development Corp.
Address City Address .City
1340 Broadway New York One Liberty Plaza New York
State Zip Phone State Zip Phone
NY 10018 NY 10006 (212) 962-2300
Contact Person Time of Inspection from:
Arnel Javal, Sr. Proj. Mgr/TRC Environmental 1:20 pm to 2:30 pm
I arrived at the premise at 1:20 pm. LVI schedule informed that activities include Prep platforms in shafts
for scrape, scrape fireproofing, box debris on Z’" floor, box debris, clear off floor on 6'*' floor.
Eagle erecting scaffolds to access deck, wash scaffolds, seal criticals, clear off floor on 5"' floor.
I proceeded to the south side decon. signed the log book, don appropriate level of personal protective
equipment to enter the regulated area on 6“' floor. One worker was present for decon maintenance.
e'” Floor - 7 workers were present on the floor cleaning and plasticizing the platforms Inside the shaft area,
spraying with amended water, inspecting the critical barriers, picking up the excess water and gross wet
debris on the north side of the work area, sweeping and vacuuming with equipment equipped with HEPA
filters, elevating the electrical cables, cleaning floor from debris. Others were preparing, wrapping
and loading out boxes. 3 Gaylord boxes were ready to be taken out.
Inspection was done on micro trap machines and tents.
Using B stairs I proceeded to the 7*’' floor.
Z'" Floor - 18 Workers were working on the floor. Workers on platforms were scraping fireproofing inside
the shaft area, spraying with amended water, removing debris from the floor, placing into the asbestos
waste bags, cleaning the floor. Other workers were preparing and wrapping boxes, 2 Gaylord boxes were
ready for load out, 20 micro trap machines were powered on and 5 on stand by. Inspection was done on
micro trap tents.
I used B stairs to proceed to the 5'" floor.
s'” Floor - 22 workers were found on the floor. 5 Eagle scaffolding workers were in the process of erecting
the scaffolds to access the deck; carpenters were working with plywood to construct the platforms on the
south side of the work area. Two workers on the north side of the floor were jack hammering the floor using
crow bars to break the concrete. Other workers were sealing the criticals, preparing and wrapping boxes.
13 Gaylord boxes were ready for load out. 20 micro trap machines were powered on and 5 on stand by.
Inspection was done on micro trap tents.
I used B stairs to go back to the 6’^ floor.
After following the decontamination procedure I signed the log book and used south hoist to return to the
ground floor.
Inspection was done on ATC trailer.
NOV# Infraction Infraction Infraction Infraction
NOV# Infraction Infraction Infraction Result Code
2
NOV# Infraction Infraction Infraction Supervisor’s Initial
Borough I-Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond
Building Type A >6 stories B <6 stories C single family D school E hospital F public owned
Result Code 1 = violation Issued 2-No Violation Issued 3=No access 4=Project not started (no NOV)
5^Public Owned Property
CITY_DEP_WORBY_CANNATA_SUBP_000131268
NYC-WTC_000266086
OCR can misread numbers and units. Confirm readings against the page image before using them.