NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

NYC-WTC_000266077

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000266077
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 01/30/09 Floor Zip Borough Block Lot Squad # Badge # Various 10006 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze_____ F TRU2068MN08 .yes________ Contractor's Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner's Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY 10006 (212) 962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proj MgrTTRC Environmental 1:30 pm to 3:10 pm

I arrived at the premise at 1:30 pm. LVI schedule informed that activities include cleaning work area, remove materials on 5'” floor, demo, box debris, clear of floor on 3’“' and 2"'^floors, check criticals, prepare for demo on 1 ” floor. I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area on 5"’ floor. Negative air pressure on the floor was 0.021. One worker was present for decon maintenance. 5*’’ Floor - 30 workers were present on the floor, using scissor lifts to remove metal fixtures from the frames at the west side critical barriers, fine cleaning the floor with amended water at the east side of the work area, picking up excess water and gross saturated debris using a wet-dry shop HEPA vacuum, clearing off floor, preparing boxes; electricians working at the electrical panel. 10 Gaylord boxes were sprayed with amended water and ready to be taken out. Inspection was done on micro trap machines and tents. After following the decontamination procedure I signed the log book and used north hoist to proceed to the 4*''loor, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area. One worker was present for the decon maintenance. 4*'’ Floor - No activities or personnel observed on the floor. Inspection was done on micro trap machines and tents. I observed excessive water accumulation in the area and dirty filters of micro trap machines. Using B stairwell I proceeded to the 3'^'’ floor. 3'''' Floor - 40 workers were present inside the work place, cutting and removing air ducts, metal fixtures from the ceiling at the various locations on the floor using scaffolds and scissor lifts; removing pipes from the ceiling, cutting metal, using equipment equipped with HEPA filters, spraying around the area, picking up debris, placing into the boxes and spraying with amended water; A large amount of poly wrapped beams exists on the floor. 35 Gaylord boxes were ready for load out. Inspection was done on micro trap machines and tents. I observed that OTie_.micro trap machine was not working. I met Handlers Supervisor of the floor, who was advised to: conduct emergency repaiFof the micro trap, r^lace the filters and pick up excess water on the 4*” floor. I used B stairwell to proceed to the 2"'’ floor, 2"“ Floor - 40 workers were working on the floor. Electricians working with cables, replacing the light bulb cages; Carpenters working on the east side of the area constructing the platforms. Workers on scaffolds and scissor lifts were removing the pipes, fiber glass insulation and air ducts from the ceiling, cutting into the pieces using tools with HEPA vacuum attached, picking up debris from the floor, placing into the boxes and spraying the work area with amended water. Other workers were clearing off floor, preparing, wrapping and loading out boxes, replacing the filters of the micro traps, wrapping beams in poly sheeting. 30 Gaylord boxes were on the floor. Numerous poles of poly wrapped beams have been sprayed with amended water were present in the various areas of the floor. Inspection was done on micro trap machines and tents. I used B stairwell to go back to the 3"^ floor. After following the decontamination procedure I signed the log book and used north hoist to return to the ground floor. Inspection was done on ATC trailer.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor’s Initial ______ Borough 1 “Manhattan 2-Bronx 3=Brooklyn 4=Queens 5=Richmond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code 1 = Violation Issued 2=No Violation Issued 3=No access . 4=Project not started (no NOV) 5=Public Owned Property

C ITY_D EP_WO RBY_C AN NAT A SU B POO0131239

NYC-WTC_000266077

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000266077Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →