NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premises: Inspection Date:
130 Liberty Street 01/22/09
Floor Zip Borough Block Lot Squad #1 Badge# AO11
Various 10006 1 54 1 1
Inspector Building Type Basis of Inspection Photos Taken
N. Patel A TRU2068MN08 No
Contractor's Name Sample Number
LVI Environmental
Address City Sample Number
462 Getty Avenue Clifton
State Zip Phone Sample Number
NJ 07011 (973) 772-3660
Laboratory Name Ov^ner’s Name
TRC Environmental corp. The Lower Manhattan Development Corp.
Address City Address City
1430 Broadway New York One Liberty Plaza New York
state Zip Phone state Zip Phone
NY 10018 NY 10006 (212) 962-2300
Contact Person Time of Inspection from:
Arnel Javal, Sr. Proj. Mgr. / TRC Environmental 8:55 am - 9:35 am (4’^ & 5*^ floor) and 1:35 pm -
2:15 pm (3^" & 2''" floor).
On the 4"’ floor, I enters to the decontamination unit, suits up, dons respirator and enters to the containment.
Nobody working on the floor. Two security guards were present on the floor and One person was in the
decontamination system. An inspection was done on micro trap machines and micro trap tents - Air pumps were
on. Four Air filters were found dirty on micro trap machines in the N/E corner. 1 told foreman Paul on the 5’’’
floor to send one person to replace it. I used stair B to go to 5* floor.
On the S"’ floor, I met Mr. Paul, foreman. There were 21 people working on the floor. They were cleaning
ceiling by spraying amended water on it, vacuum cleaning water from floor, clearing ice from floor and salting
floor, moving boxes and preparing Gaylord boxes and cutting wood into pieces with HEPA vacuum attached to
power tool. Three (3) Gaylord boxes and number of wrapped plastic bags were on the floor to be load out. I used
stair B to go back to 4*’’ floor, proceeds to the decontamination unit and showers out.
On the 3'^'’ floor, I entered to the work area from south side with PPE and met Mr. Geraldo, supervisor. There
were 38 people working on the floor. They were demolishing ceiling attachments and boxing debris, spraying
amended water on debris, preparing Gaylord boxes, cutting metal into pieces with HEPA vacuum attached to the
power tool and in the decontamination system. Thirteen (13) Gaylord boxes piled on the floor ready to be load
out. Negative Air pressure was -0.023. Ten micro trap machines were down because of electric power problem.
Supervisor was waiting for electricians to come and fix the problem. I used stair Bto~go to 2"‘' floor'
On the 2"'' floor, 1 met Mr. Jose Jimenez, supervisor. There were 42 people working on the floor. They were
demolishing attachments to the ceiling and boxing debris, spraying amended water on the debris and in the
boxes, preparing Gaylord boxes, cutting metals with HEPA vacuum attached to the power tool and checking and
re-sealing barrier with duct tapes. Ten (10) Gaylord boxes piled on the floor ready to be load out. I used stair B
to go to 3'“' floor, proceeded to the decontamination system, decontaminated myself, signed the log book and
exited out. My obserc'ations were discussed with TRC and ATC persons.
NOV# result
2
NOV#
NOV# SUPERVISOR"
Borough ]=Manhattan 2=8ronx 3=Brooklyn 4=Queens 5=Richmond
Building Type A >6 stories B <6 stones C single family Dschool E hospital F public owned
Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Prijjcci not started (no NOV) 5=rublic Owned Property
C)TY_DEP_WORBY_CANNATA_SUBP_000131234
NYC-WTC_000266072