Asbestos inspection, 1340 Broadway, Mar 2009

Machine-extracted title · confidence 32%

Asbestos inspection record for TRC Environmental Corp at 1340 Broadway.

NYC-WTC_000266057
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 03/04/09 Floor Zip Borough Block Lot Squad # Badge # Various 10006 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze F TRU2068MN08 yes Contractor’s Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner’s Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY 10006 (212)962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proj. Mgr/TRC Environmental 8:35 am to 10:00 am

I arrived at the premise at 8:35 am. LVI schedule informed that activities include: remove walker ducts and raceways on 13" floor, scrape fireproofing, clear off floor, temp platforms in shaft on 3’''floor, demo walls, clear off floor, scrape fireproofing, erect platforms various locations on 2"" floor, clear floor, cut ducts, demo walls, ceilings on 1®* floor. I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area on 2'’‘’floor. Two workers were present for the decon maintenance, cleaning the shower chamber and organizing the clean room. Negative air manometer reading was 0.032. I used B stairwell to proceed to the 3™ floor.

3'“' Floor - 32 workers were present. Workers were plasticizing the area 2 and 3 with poly, moving scaffolds, spraying the fireproofing with amended water, re-sealing the critical barriers on the north/west side, preparing the work area for scraping. Workers at the north shaft were plasticizing the platform, at the south side shaft - erecting the platform. Other workers were cutting metal fixtures from the ceiling at the various locations, cutting metal into the pieces, spraying around the area, wrapping beams with poly, preparing boxes. 3 Gaylord boxes were ready for load out. Inspection was done on micro trap machines and tents. I observed that A stainvell door needed to be re-taped. Supervisor was advised, and the door was re-sealed immediately. I used B stairwell to proceed to the 2"'’ floor.

2"'' Floor - 58 workers were found inside the work area, spraying the fireproofing at the area 2 with amended water, re-sealing the critical barriers, floor, preparing the area for scraping. Other workers were moving the carts with boxes, cutting metal using tools attached to the HEPA vacuum, wrapping beams with poly, preparing boxes. 20 Gaylord boxes were on the floor sealed, sprayed and ready for load out. 35 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents. I used B stairwell to proceed to the 1®* floor.

V Floor - 75 workers were on the floor, demolishing the brick walls and spraying with amended water; electricians wrapping electrical cables with poly, workers on scissor lifts were removing hard concrete drop ceiling, removing black metal panels from the columns at the south side of the work area, clearing shafts, placing debris into the boxes and spraying with amended water, cutting metal at the various locations into the pieces, preparing, wrapping and loading out boxes through the waste decon. A large amount of debris and poly wrapped beams exists on the floor. 15 Gaylord boxes were on the floor ready for load out. Inspection was done on micro trap machines and tents. I used B stairwell to go back to the 3’Yloor. After following the decontamination procedure I signed the log book and used north hoist to proceed to the 13" floor.

13'*' Floor - No activities or personnel observed on the floor. I contacted LVI Supervisor Fabio, who informed me that water hose was frozen and there was no water inside the 13*^ floor decon. I used north hoist to return to the ground floor. Inspection was done on ATC trailer.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor’s Initial

Borough l=Manhattaii 2=Bronx 3=Brooklyn 4=Queens 5=Richiiiond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV) 5=Public Owned Property

CITY_DEP_WORBY_CANNATA_SUBP_000131068

NYC-WTC_000266057

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000266057Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →