NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

NYC-WTC_000265972

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000265972
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 01/17/09 Floor Zip Borough Block Lot Squad # Badge # Various 10006 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze F TRU2068MN08 yes Contractor’s Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner’s Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY 10006 (212) 962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proi. Mgr/TRC Environmental 1:15 pm to 2:25 pm

I arrived at the premise at 1:15 pm. LVI schedule informed that activities include Eagle - erecting scaffolds to access deck, cleaning work area on 5"’ floor, preparing North decon, clear off floor, start demo on 3"' floor, clear of floor, prepare for demo on the 2'"^ and 1 floors.

I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area on 4"’ floor. Negative air pressure on the floor was 0.043. One worker was present for the decon maintenance. Using B stairwell I went to the 5"’ floor. 5*'’ Floor - 10 workers were working on the floor, plasticizing platforms of scaffolds at the area 9. 10, 11.2 Gaylord boxes were ready for load out. Inspection was done on micro trap machines and tents. I used B stairwell to proceed to the 3''“ floor. 3^'' Floor - 38 workers were working on the floor replacing water hose insulation, removing metal fixtures from the ceiling, using scaffolds and ladders, breaking down the wall on south/west side of the work area, spraying with amended water, cutting metal using tools attached to the HEPA vacuum, picking up debris, placing into the boxes and spraying, removing frames from the wall and cutting, using equipment with HEPA vacuum attached. Other workers were preparing, wrapping boxes, removing debris from the ground, loading out boxes through the waste decon. A large amount of poly wrapped beams and sealed 28 Gaylord boxes, which have been sprayed with amended water, were at various locations on the floor ready for load out. 5 Gaylord boxes were still open. 20 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents. Using B stairwell I proceeded to the 2"“ floor. 2"“ Floor - 35 workers were found inside the work place cleaning off the floor, plasticizing the glass wall partition with 2 layers of poly to break it down, demolishing the escalator shaft, taking down sheetrock wall, removing floor tiles, sealing the critical barriers, wrapping beams with poly, loading out boxes, removing metals from the ceiling and the wall, cutting to the pieces, placing into the boxes and spraying with amended water. Inspection was done on micro trap machines and tents. Electrical panels were repaired and micro trap machines were powered on. 20 Gaylord boxes and a large amount of poly wrapped beams were ready to be taken out. I used B stairwell to proceed to the l” floor. V Floor - 2 workers were on the floor. Workers inside the electrical room were plasticizing the frames of the engine machines. I used B stairwell to go back to the 4“’ floor.

After following the decontamination procedure I signed the log book and used south hoist to return to the ground floor. Inspection was done on ATC trailer.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor’s Initial v^. Borough l=Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond Building Type .4 >6 stories B <6 stories C single family D school E hospital F public owned Result Code I = Violation Issued 2=No Violation Issued .3 No access 4-Project not started (no NOV) 5=Public Owned Property

CITY_DEP_WORBY_CANNATA_SUBP_000130848

NYC-WTC_000265972

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000265972Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →