NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Asbestos inspection, 130 Liberty Street, Jul 2008

Machine-extracted title · confidence 32%

Asbestos inspection record for 130 Liberty Street with photos and intake details.

NYC-WTC_000265884
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 07/24/08 Floor Zip Borough Block Lot Squad # Badge # Various 10006 1 54 1 1 AO61 Inspector Building Type Basis of Inspection Photos Taken H. Guirguis A TRU0086MN08 Yes Contractor's Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner’s Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1430 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY 10006 (212) 962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proj. Mgr.TTRC Environmental 9:15 am - 10:20 am

On arrival, I met Arnel Javal, the Senior Project Manager of TRC Environmental at the TRC field office, who informed me that a total of 1 Supervisor and 24 Asbestos Handlers were on the 15” floor for the first shift. The daily work schedule informed me of the following: 1. 16‘", 17'" floors: 30 men fine cleaning floors 2. 14‘" & 15‘" floors: 24 men scraping, boxing debris 3.13'" &12'" floors.: 16 men demo, boxing debris 4. 9'"& s'" floor: Setting up Micro traps 5.6 men - Various floors loading out boxes to ATC trailer

I went to the decontamination enclosure system on the 14"’ floor and after signing the log book, donned personal protection and accessed the work areas. 1. The workers were found in the process of wrapping debris; there was still a lot of wet debris on the floor 10 workers on scaffolds, scraping ceilings and beams 6 workers removing debris from the floor 3 workers fine spraying amended water in the work area 4 workers preparing Gaylord boxes 1 worker in the decontamination enclosure system 12 Gaylord boxes were on the floor ready to be taken out

2. Inspection was done on the Micro trap Machines and the Micro trap tents, 20 Micro trap Machines were powered on and 5 were on stand by 3. The Negative Pressure was 0.063

I exited the work area after decontaminating myself and signing the log book.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor’s

Borough 1 “Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code 1 “ Violation Issued 2“No Violation Issued 3=No access 4“Project not started (no NOV) 5=Public Owned Property

CITY_DEP_WORBY_CANNATA_SUBP_000130632

NYC-WTC_000265884

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000265884Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →