NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Asbestos inspection, 130 Liberty Street, Aug 2008

Machine-extracted title · confidence 32%

Asbestos inspection record for 130 Liberty Street with photos and site details.

NYC-WTC_000265877
Page image
Scanned page image, NYC-WTC_000265877
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. , Inspection Date: 130 Liberty Street 08/07/08 Floor Zip Borough Block Lot Squad # Badge # Various 1O006 1 54 1 1 AO61 Inspector Building Type Basis of Inspection Photos Taken H. Guirguis A TRU0086MM08 Yes Contractor's Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner’s Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1430 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY 6 (212) 962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proj. Mgr./TRC Environmental 05:00 pm - 06:30 pm

On arrival I met Victor, Supervisor for TRC Environmental, at the TRC field office. He informed me that a total of 1 Handler Supervisor and 32 Asbestos Handlers were on the 15'" floor today for the second shift. The daily vi'ork schedule informed me of the follov/ing: 1. 16'” & 17'” floors: Preparing for final air testing. 2. 14'” & 15'” floors: 32 men (each) loading out debris, scaffolds, etc. 3. 13'” & 12'” floors. 32 men (each) demo, boxing debris 4. Various floors : 14 men loading out boxes to ATC trailer

I went to the decontamination enclosure system on the 15'” floor and after signing the log book, donned personal protection and accessed the work areas. 1. 15'” floor: workers were found in the process of wrapping debris; there was still a lot of wet debris on the floor, demolition was completed in all areas, Inspection was done on the Micro trap Machines and the Micro trap tents. 14 workers removing debris from the floor, 7 workers were using power tools, HEPA vacuum attached with the power tools, 4 workers were over scaffolds cutting raceways, 3 workers fine spraying amended water in the work area, 4 workers preparing Gaylord boxes, 34 Gaylord boxes on the floor ready to be taken out

I exited the work area after decontaminating myself and signing the log book.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervis^^ lial

Borough l=Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV) 5=Public Owned Property

CITY_DEP_WORBY_CANNATA_SUBP_000130588

NYC-WTC_000265877

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000265877Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →