NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Asbestos inspection, 130 Liberty Street, July 2008

Machine-extracted title · confidence 32%

Asbestos inspection record for 130 Liberty Street with photos and inspection details.

NYC-WTC_000265881
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 07/25/08 Floor Zip Borough Block Lot Squad # Badge # Various 10006 1 54 1 1 AO61 Inspector Building Type Basis of Inspection Photos Taken H. Guirguis A TRU0086MN08 Yes Contractor’s Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner’s Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1430 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY 10006 (212) 962-2300 Contact Person Time.of Inspection from: Arnei Javal, Sr. Proj. Mgr./TRC Environmental 8:35 am - 9:20 am

On arrival I met Victor, the Project Monitor of TRC Environmental, at the TRC field office who informed me that a total of 1 Supervisor and 24 Asbestos Handlers were on the 14'"’floor for the first shift. The daily work schedule informed me of the following: 1, 16'", 17'" floors: 30 men fine cleaning floors 2, 14'" & is'"floors: 24 men scraping, boxing debris 3. 13'" &12'" floors, 16 men demo, boxing debris 4, s'" floor: 6 men setting up Micro traps 5, 6 men - various floors loading out boxes to ATC trailer

I went to the decontamination enclosure system on the U'" floor where I met Johnny Rodriguez, the supervisor of TRC. : After signing the log book I donned personal protection and accessed the work areas. 1. The workers were found in the process of covering the floor with plastic 2. Only 19 workers were in the work area and 2 workers in the decontamination enclosure system 11 workers covering the floor with plastic 6 workers checking wall barrier and tape 2 workers preparing Gaylord boxes 3 Gaylord boxes were on the floor ready to be taken out

3. Inspection was done on the Micro trap Machines and the Micro trap tents. 20 Micro trap Machines were powered on and 5 were on stand by 4, There was no landing pad or arrangement to wipe the feet 5, The Negative Pressure was 0,073

I exited the work area after decontaminating myself and signing the log book.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor’s Initial

Borough I “Manhattan 2-Bronx 3“Brooklyn 4=Queens SRidimond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code I = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV) 5=Public Owned Property

CITY_DEP_WORBY_CANNATA_SUBP_000130614

NYC-WTC_000265881

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000265881Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →