NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 2 pages

Asbestos notification/amendment form, Building 12

Machine-extracted title · confidence 38%

Asbestos-related notification/amendment record for Building 12 with date 03.06.02.

NYC-WTC_000252315–000252316
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

STATE OF NEW YORK - DEPARTMENT OF LABOR EmtrymCY NotificMioB Rnqneiterf

■9. DIVISION OF SAFETY ANI^HE^H a. Date of Request b. TBwofDay

ASBESTOS 03.06.02 02:10PM State Office Campus c^25X : of Persoa Granting Request * AMENDED NOTTFICATTON Building 12 - Room 454 HfliDn S. Murray ______ L ( ] Postponed ( ] Cancelled UfV WORKING MTSOFTVE b. New aart Dote EMEKGEHCTifFFItOrAt. vpunwaaibmit ASBESTOS PROJECriSitf^l^^4ni^\ e NewEndDtfe JtyKeate ctmes at rim ftwm wMi «»rppri»te

d. Subninedfiy Refer to Infomutioo Sheet or Code J Ride 56 for Time Deadlines 1. NAME AND ADDRESS OF CONTRACTOR 2. FEDERAL EMPLOYER IDENnHCATTGN NO. 3. ASBESTOS UCENSE NO. 11-2860475 99-0955 Safeway Environmental Corp. 4 MACJNG ADDRESS, (if diflerea than luted in ITEM I) 1379 Commerce Avenue Bronx, NY 10461 5, NAME AND ADDRESS OF PARTY FOR WHOM THE PROJECT IS BEING PERFORMED Bovis Lend Lease 200 Park Avenue, NY, NY S.a. NAME AND TITLE OF DULY AUTHORIZED REPRESENTATTVE b TELEPHONE NO

Don Adler Vice President (718) 794-4300 PROJECT INFORMATION PROVIDE ALL INFORMA TION NEQUESTSD FOR THE BlNLDfNG/Sn-£Ar WH/CN THE ASBESTOS filiOJECT WILL BE CONDUCTEtX 7- AI»RESS(INCLUDENAMEOFBUILDING.ROOMNO .CnY. TOWN. VILLAGE) 8. NAME OF BUILDING OWNER Grourxi Zero, PATH train tunnel @ North Slurry Wail NYC Dept of Design & Construction 9. COUNTY to. CURRENTLSEOFBULDING II. A(£ OF BUILDING 12. TOTAL CONTRACT AMOUNT Manhattan Train Tunnel beneath former 6VVTC 20 years 10.800 If/Osf 13. PROJECTED DATES(9 > List 14 TYPE OF ASBESTOS WORK (CHECK 15 WUX WORK ON THE PROJECT BE CONDUCTED UNDER A VARIANCE? If phased project dales B ALL WHICH APPLY yes, speedy the type of variance. NO REMARKS frtcra28) [ JPlpoReUted [ J APPUCABLE VARIANCE . NO.: ( J Spr^ed on Insulation a. ACTUAL PARTING DATE f I Roofing/Flasfiing { I fNDTVIDUAL VARIANCE-PFTTnON NO.; ( J Vessel Covering 03.06.02 (02.21.02) ( JSiding 16. WILL SUBCONTRACTORS BE USED ON THE PROJECT? pCJNO fJYES ( J VAT Ifyes, please Ust name and federal employer identifteatioa number of each b. PROJECTED ENDING DATE ( J Demolition subcontractor in REMARKS (rtem 26) on reverse of fonn. pq Other (Specify)

04.21.02 Transrte opnduit 17. ASESrO5PROCeDURE(S)TOBEUSED is: TYPE OF ASBESTOS 19. AMOUNT OF ASBESOS INVOLVED > CHECK AU. APPLICABLE BOX(ES) (CHECKM ffmCHAPPLr) MATERIAL UtlEAEJTET SQUARE] ( 1 Lessihan260 ___________ ( I Less than 160 pCj REMOVAL ( ] DEMOLmON (S^dy) (Specify) [ ] ENCLOSURE [ J DISTURBANCE I ] FRIABLE ( J ($100) 26(M29 ( I (dOO) 160-239 ( ] ENCAPSULATION ( ] HANDLING ( 3 ($200) 430-824 ( 3 ($200) 260499 ( J OTHER (S^pecify) (XI NONFRIABLE ( ) ($500) 825-1649 [ 1 ($500) 500-999 (X] <$I(XX>) 1,650 OR MORE ( ] ($1000) I.OOOORMORE 10,800 If Osf (SpsciW (Specify) ,20. METHODS TO BE USED AT PROJECT SITE TO PREVENT ASBESTOS DISSEMINATION (INCLUDING HTE OF EQUIPMENT AND VENTILATION SYSTEMS USED)

Full containment methods and procedures in accordance with ICR56.

21.1 verify that the informatioo specified on this nprificaooo is true and accurate and that the project will be conducted in conpliance with the requirements

ofCode Rule

___ 03.06.02 a Signature oftbe Contractor Of EhiJyAuthohM Representative b. Date

PREPARE THIS APPLICATION IN TRIPLICATE AND SUBMIT: • Ar original and one copy (with an ink signature on both copies) to the New York Slate Department of Labor. Division of Safely and Health. Asbestos Control Bureau. Stale Office Campus, Building I2-Room454. Albany, NY 12240; retain one copy for your records ■ A certified check or money order, made payable to the Commissioner of Labor, for the fee due based on the project size as shown in item 19. This notification must be submitted al least 10 days prior to the starting date of the asbestos project. DOSH-iaa <11-91)

03.024247

CONFIDENTIAL INSURANCE INFORMATION, CITY_21MC100_002757811 SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000252315

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000252315Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000416762

Contract specs for abatement of asbestos-containing materials at Police Academy.

Similar indexed content

Compare copies and versions →