FEDERAL EMERGENCY MANAGEMENT AGENCY O.M B. No. 3067-0151
PROJECT WORKSHEET Expires April 30, 2001
PAPERWORK BURDEN DISCLOSURE NOTICE
Public reporting burden lor this form is estimated to average 30 minutes. The burden estimate includes the time for reviewing
mellucllorrt, searching existing data sources, gathering and maintaining the needed data, and c ompleting and submitting the forms.
You are nol lequired Io respond to this collection of information unless a valid OMB control number is displayed in the upper right
MMttet of the form s. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing the burden to:
Inloimelion Collection Management. Federal Emergency Management Agency, 500 C Street, SW, Washington, DC 20472,
Haductlon ProiecI (3067-0151). NOTE: Do not send your completed form to this address.
TiONNO: PROJECT NO. FIPS NO. DATE CATEGORY
061-51000-22 02/27/02 E
DAMAGE FACILITY WORK COMPLETE AS OF:
Public School 234 School Clean Up________ 10/31/01 . 100 %
A^PLldANT COUNTY
New York City, Board of Education New York
LOCATION LATITUDE LONGITUDE
292 Greenwich Street, New York, NY 10282
DAMAGE DESCRIPTION AND DIMENSIONS
The collapse of the World Trade Center (WTC) on September 11, 2001 caused a massive cloud of concrete and dust to impact
neighboring buildings blocks away from the World Trade Center complex. Public School. 234 (PS 234)'is located at 292 Greenwich
Street, approximately two-tenths of a mile from One WTC. The dust cloud from the collapse of One WTC directly impacted the PS 234
iBciltty and covered the building with a layer of dust. Dust and debris entered the bui Iding through the ventilation system and through
open windows and doors. In addition, PS 234 was also used as a relief center to provide equipment, food, shelter, showers, change of
clothes, and supplies for the emergency rescue and recovery workers. Work to clean PS 234 was performed from September 25,
2001 till October 31, 2001.
SCOPE OF WORK
Work complete consists of the expenses incurred by the New York City, Board of Education (BoE) for the work performed by the
School Consiruction Authority (SCA). SCA will be submitting all costs to the BoE for reimbursement. These costs include the
contractual work for remediation and restoration of PS 234 on the basis of design, capacity and function of the facility prior to the
dlaaalar and In conformity with applicable standards.
School Construction Authority was responsible for the coordination and construction management of the contractors performing work
al PS 234 related to the collapse of WTC. Costs associated with the work performed by SCA consists of regular time labor
(19,919.34), Including the New Y ork City regular time fringe benefit rate for non-uniform employees of 44.66% ($1,616.36).
Total Incurred cost for regular time labor is $5,235.60. Costs associated with the overtime for labor for SCA (10,007.66),
Including the New York City overtime fringe benefit rate for non-uniform employees of 10.73% ($1,073.83). Total incurred cost
for overtime labor Is $11,081.49.
PAI. Environmental Safety Corp. (PAL) and KISS Construction performed clean up and remediation operations of the interior of the
troHdinB. as well as pressure washing the exterior. Citywide Environmental Services LLC cleaned the HVAC system of dust and
debris Corinthian Construction Co, Inc. was responsible of clearing debris from the roof of the school. Gravel was removed from the
tdpl. Iha roof membrane was pressure washed, and new gravel was placed on the roof. Taylor Environmental Group, Inc. conducted
Quality control air monitoring and analytical services, as well as visual inspections to determine the presence of fine particulate dust.
Wairan & Panzer Engineers (Warren & Panzer) conducted aggressive sampling and transmission electron microscopy (TEM) analysis
Of tavaral floors and the HVAC unit. TDX/Secom performed construction oversight of all contractual activities to insure quality of work.
Total contractual costs submitted to BoE from SCA for this project worksheet is $1,252,981.39.
Sm N#ii«live for detailed description of the work performed by SCA and each contractor, as well as their respective costs.
ToIaI costs associated with this project worksheet for contractual work and labor is $1,269,298.48.
Doss the Scope of Work change the pre-di saster condition at site? □ Yes eg No
Special Consideration issues included? Yes [2] No Hazard Mitigation proposal included? | | Yes (X] No
Is there Insurance coverage on facility? Q Yes PH No
PROJECT COST
ITEM CODE NARRATIVE QUANTITY/UNIT UNIT PRICE COST
1 9003 Contract - School Construction Authority 1 / LS $1,252,981.39 $ 1,252,981.39
2 9007 Labor - Regular Time wf fringe_______ 1 / LS $ 5,235.60 $ 5,235.66
3 9007 Labor - Overtime w/ fringe 1 / LS $11,081.49 $11,081.49
Total $ 1,269,298.48
PREPARED BY: Dan Marlin REMARKS: Project Officer
MA Form 90-91, SEP 98
CONFIDENTIAL, CITY_21MC1OO_O13247111
SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008
NYC-WTC_000251589