NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 33 pages

Disaster 1391 project, NY, Mar 2003

Machine-extracted title · confidence 25%

Expense and applicant details for NYC/Design and Construction related to disaster project.

NYC-WTC_000251095–000251127
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Date. 03/31/2003 FEDERAL EMERGENCY MANAGEMENT AGENCY Project Completion and Certification Report {P.4)

Disaster #11391

P.A. ID: 031-51000-19 Applicant: NEW YORK / DESIGN AND CONSTRUCTION, DEPARTMENT OF

PW# VSN PKG# INF Cat Work Projected Approved PW % Actual Date Amt. Claimed Comments Done By Compl. Date Amt. Compl. Completed by Applicant at Incp —~ COSTS WORK PERFORMED DURING THE PERIOD OF 9/11/01 THROUGH April 12, 2002 HAS BEEN ADDRESSED UNDER PW 95 (REFER ro PW 102) AND PW 750.

DDC HAS PROVIDED A VERBAL ESTIMATE FOR AMEC'S TOTAL COSTS FOR PHASE 1 IN THE AMOUNT OF $73,500,000. THIS ESTIMATE IS BASED ON BILLINGS TO DATE PLUS ESTIMATES PROVIDED TO DDC FROM AMEC FOR ADDITIONAL COSTS TO BE HILLED. THE ESTIMATE HAS BEEN REVIEWED BY FEMA AND APPEARS TO BE REASONABLE.

SINCE January 7, 2002, AMEC HAS MAINTAINED A REDUCED STAFF WHOSE PURPOSE IS TO FULFILL ALL OUTSTANDING CLOSE OUT REQUIREMENTS. SINCE January 7th, AMEC STAFF HAVE MET WITH DDC AND FEMA STAFF TO PERFORM AN IN-DEPTH REVIEW OF ALL DOCUMENTATION AND TO DISCUSS ANY FINANCIAL ISSUES AND EXCEPTIONS GERMANE TO THE AFOREMENTIONED CLOSE OUT REQUIREMENTS.

AS PAYMENT REQUISITIONS FOR INCURRED COSTS ARE SUBMITTED BY AMEC TO DDC, FEMA REVIEWS THE REQUISITIONS WITH RESPECT TO FEMA PUBLIC ASSISTANCE PROGRAM ELIGIBILITY CRITERIA. AT THIS POINT FEMA HAS PERFORMED A PRELIMINARY REVIEW OF REQUISITIONS 1 THROUGH 9 SUBMITTED BY AMEC. HOWEVER, FEMA HAS NOT MADE A FINAL DETERMINATION REGARDING THE ELIGIBILITY OF THE COSTS PRESENTED IN THOSE REQUISITIONS, BECAUSE DDC HAS NOT APPROVED ANY OF THE REQUISITIONS. AFTER DDC APPROVES THE PAYMENT REQUISITIONS SUBMITTED BY AMEC OR WHEN DDC COMPLETES THE CONTRACT CLOSEOUT, FEMA WILL REVIEW THE REQUISITIONS TO DETERMINE THE FINAL, ELIGIBLE COST. AT THAT TIME A FINANCIAL RECONCILIATION. OR Cl OSFOUT, OF THIS PW (ALONG WITH PWS 95/102 AND 750) WILL BE PERFORMED BY FEM/VSEMO THIS MAY RESULT IN DEOBLIGATION OF FUNDS, DEPENDING ON THE ACCURACY OF DDC'S COST ESTIMATE.

FEMA WILL ALSO REVIEW ALL EQUIPMENT PURCHASED FOR THIS PROJECT TO DETERMINE AN ELIGIBLE FUNDING AMOUNT FOR THE EQUIPMENT. IF EQUIPMENT HAS RESIDUAL VALUE AT THE COMPLETION OF THE PROJECT, FEMA MAY REDUCE THE ELIGIBLE AMOUNT FOR THAT EQUIPMENT BASED ON THAT RESIDUAL VALUE. FEMA HAS DEDUCTED 5% OF DDC'S TOTAL ESTIMATE FOR AMEC'S PHASE 1 COSTS FROM THE COSTS A

Page 23 of 311

NYC-WTC_000251119

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000251119Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →