NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 33 pages

Disaster 1391 project, NY, Mar 2003

Machine-extracted title · confidence 25%

Expense and applicant details for NYC/Design and Construction related to disaster project.

NYC-WTC_000251095–000251127
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Date- 03/31/2003 FEDERAL EMERGENCY MANAGEMENT AGENCY Project Completion and Certification Report (P.4) Disaster #: 1391

PA ID’061-51000-19 Applicant; NEW YORK / DESIGN AND CONSTRUCTION, DEPARTMENT OF PW# VSN PKG# INF Cat Work Projected Approved PW % Actual Date Amt. Claimed Comments Done By Compl. Date Amt. Compl. Completed by Applicant at Insp- - --------- SITE NUMBER : 1 FACILITY NAME ; V/TC COMPLEX AND SURROUNDING FACILITIES LOCATION NEW YORK CITY, NEW YORK m ■( ipf, ( IF WDHK BOVIS LEND LEASE (BOVIS) AND AMEC CONSTRUCTION MANAGEMENT (AMEC), WERE HIRED BY DDC, AS TWO OF FOUR CONSTRUCTION MANAGERS (CMS). FOR REMOVAL OF THE CONCRETE, STEEL AND OTHER MIXED DEBRIS FROM DESIGNATED AREAS WITHIN THE WTC COMPLEX. AS THE DEBRIS REMOVAL PROJECT PROGRESSED, THE NEED FOR 4 CMS DIMINISHED. ON January 7 2002 BOVIS AND AMEC FORMED THE BOVIS/AMEC ALLIANCE (AMEC IS A FEE SHARING SUBCONTRACTOR TO BOVIS) AND BECAME THE SOLE CM MANAGING THE REMAINING DEBRIS REMOVAL WORK. THE DEBRIS REMOVAL AND ASSOCIATED WORK, UNLESS OTHERWISE NOTED, WAS PERFORMED ON A TIME AND MATERIALS BASIS AT THE WTC COMPLEX PURSUANT TO A DRAFT CONTRACT WITH DDC. THE WORK WAS BOTH SELF-PERFORMED AND PERFORMED BY SUBCONTRACTORS AND/OR CONSULTANTS HIRED BY BOVIS/AMEC. ANY SUBCONTRACTORS AND/OR CONSULTANTS THAT HAD BEEN HIRED BY ONE OF THE QTI lER CMS AND WERE STILL NEEDED FOR THE COMPLETION OF THE PROJECT, WERE TRANSFERRED TO BOVIS/AMEC.

FROM TIME TO TIME DDC HAS ISSUED CLARIFICATIONS TO THE CONTRACT AND CITY PROCEDURES. THESE CLARIFICATIONS HAVE DEEN ACCUMULATED BY DDC IN A PROJECT SPECIFIC BINDER(S) CALLED THE "POLICY/ PROCEDURE BOOK " THESE CLARIFICATIONS TAKE PRECEDENCE OVER THE DRAFT CONTRACT. ALSO. THE CONTRACT REQUIRES CERTAIN APPROVALS BY THE CITY, IE, STAFFING PLANS, BILLING RATES, BID PROCUREMENTS, ETC. THESE HAVE BEEN ACCUMULATED BY DDC FOR THIS SPECIFIC PROJECT AND IS REFERRED TO AS THE "APPROVALS BOOK".

I HIS PW HAS BEEN WRITTEN FOR PHASE 2 DEBRIS REMOVAL CONTRACT WORK COMPLETED DURING THE PERIOD OF MAY 4, 2002, TO June 26, 2002, AND FOR WORK TO BE COMPLETED THROUGH THE END OF December 2002. WHILE THE PHYSICAL DEBRIS REMOVAL ACTIVITIES DESCRIBED IN THIS PW WILL BE COMPLETED ON OR AROUND June 30, 2002, THE CONTRACT CLOSF-OLIT IS ESTIMATED TO CONTINUE THROUGH THE END OF December 2002. FEMA HAS GRANTED A TIME EXTENSION FOR DDC THROUGH THE December 31,2002, FOR THE COMPLETION OF THE PROJECT. THEREFORE. THE AMOUNT PROVIDED FOR IN THIS PW IS BASED ON A COST ESTIMATE PROVIDED BY DDC TO COMPLETE BOTH THE PHYSICAL DEBRIS REMOVAl ACTIVITIES AND THE CONTRACT CLOSE-OUT. DDC HAS PROVIDED A VERBAL ESTIMATE FOR BOVIS' TOTAL COSTS FOR PHASE 2 IN THE AMOUNT OF $189,600,000. THIS ESTIMATE IS BASED ON BILLINGS TO DATE PLUS ESTIMATES PROVIDED TO DDC FROM BOVIS FOR ADDITIONAL COSTS TO BE BILLED. THE ESTIMATE HAS BEEN REVIEWED BY FEMA AND APPEARS TO BE REASONABLE.

THE COMPLETED WORK PERFORMED FROM September 11,2001, THROUGH January 6, 2002. IS REFERRED TO AS PHASE I PHASE I IS ADDRESSED UNDER PREVIOUSLY PREPARED PWS: PWS 92 (REFER TO PW 102) AND 766 FOR BOVIS AND PWS 95 (REFER TO PW 106) AND 750 FOR AMEC. NEW DEBRIS REMOVAL VJORK PERFORMED AFTER January 6, 2002. IS REFERRED TO AS PHASE II PW 870 COVERS COSTS ASSOCIATED WITH PHASE 2 W'ORK PERFORMED FROM 1/7/02 THROUGH 5/3/02,

SINCE .lanuary 7 2001. THE BOVIS/AMEC GROUP HAS MAINTAINED A STAFF DEDICATED TO FULFILL ALL OUTSTANDING CONTRACT Close out requirements, as identified on the payment requisitions that have been submitted to THE DDC BOTH BOVIS AND AMEC HAVE STAFF WORKING ON THE CLOSE OUT OF PHASE I AND PHASE II. THE CONTRACT STAFF MEETS CONTINUALLY WITH DDC AND FEMA STAFF TO PERFORM AN IN-DEPTH REVIEW OF ALL DOCUMENTATION AND TO DISCUSS ANY FINANCIAL ISSUES AND EXCEPTIONS GERMANE TO THE AFOREMENTIONED CLOSE OUT REQUIREMENTS.

AS PAYMENT REQUISiriONS FOR INCURRED COSTS ARE SUBMITTED BY BOVIS/AMEC TO DDC, FEMA REVIEWS THE REQUISITIONS WITH RESPECT TO FEMA PUBLIC ASSISTANCE PROGRAM ELIGIBILITY CRITERIA, AT THIS POINT FEMA HAS PERFORMED A Pf7ELIMINARY REVIEW OF PHASE 2 REQUISITIONS 9 THROUGH 15 SUBMITTED BY BOVIS/AMEC. HOWEVER, FEMA HAS NOT MADE A FINAL DETERMINATION REGARDING THE ELIGIBILITY OF THE COSTS PRESENTED IN THOSE REQUISITIONS BECAUSE DDC HAS NOT APPROVED ANY OF THE REQUISITIONS, AFTER DDC APPROVES THE PAYMENT REQUISITIONS SUBMITTED BY BOVIS/AMEC OR WHEN DDC COMPLETES THE CONTRACT CLOSE-OUT, FEMA WILL REVIEW THE REQUISITIONS TO

Page 12 of 311

NYC-WTC_000251108

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000251108Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →