NYC-WTC_000247554
Project monitor log page for full-containment asbestos abatement, listing project staff and project type.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗Project monitor log for containment work; lists client, contractor, and assignment details.
NYC-WTC_000247602–000247603OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
ASSUCiaikS INC PROJECT MONITOR LOG Part 1 1. Client: 2. Project Name: _ 5. Work Area(s):
6. Contractor: Ao/Po-V, 3.,
7. Contractor's Foreman: br 8. ATC Representative: I? CO vAnk J Li 9. Date: f VJj
Type of Project: Full-Containment Tent-Containment Glovebagging Other
Size of Project: Large (> t60 sq. ft., 260 lin. ft. of ACM) Small (< t60 sq. ft., 260 lin. tt.)
Phase of Abatement: Pre-abatement Sampling Prep Removal Cleaning
Encapsulation Waste Load-out Finals
FULL-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section):
Preparation of Work Area: Yes (Indicate prep work performed in 1 -10) N/A (If already completed)
1. Construction of Decon: Yes No 2. Ceiling Poly: Yes No 3. Critical Barriers (CBs): Yes No 4. Wall Poly: Yes No 5. Removal to establish CBs: Yes No 6. Floor Poly: Yes No 7. Negative air: Yes No 8. Pre-cleaning: Yes No 9. Prep work completed: Yes No 10. Temporary Power: Yes No 11. Other_______________ Yes No 12. Prep-Inspection Passes: Yes No (Explain why)
Removal: Yes (Complete 1 - 5) N/A
1. Type of ACM; Pipe Insulation Duct Insulation Fireproofing Ceiling Tile Boiler Insulation Transite Boards Floor Tile Other:
2. Negative air pressure > 0.02 in, of water: Yes No 3. Amended water used during removal: Yes No 4. Critical barriers intact for shift's duration: Yes No 5. Proper Decon procedures followed: Yes No Cleaning: Yes (Complete 1 - 6 ) N/A
1. 1 st Stage 2nd Stage 3rd Stage 2. 12/12-hour waiting period after 1st cleaning: 3. Removal of 1st poly layer after 1st cleaning: Yes No 4. 4/12-hour waiting period after 2nd cleaning: Yes No 5. Removal of 2nd poly layer after 2nd cleaning: Yes No 6. 1/12-hour waiting period after 3rd cleaning: Yes No
TENT-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section):
Preparation of Work Area: Yes (Indicate prep work performed in 1 - 6) N/A (If already completed)
1. Construction of Tent: Yes No 2. Pre-cleaning: Yes No 3. Construction of Decon: Yes No 4. Negative Air: Yes No N/A 5. Prep work completed: Yes No 6. Prel-inspection passes: Yes No
Removal: 1. Type of ACM: Pipe Insulation Duct Insulation Fireproofing Ceiling Tile Boiler Insulation Transite Boards Floor Tile Other: 2. Method or Removal: Gross removal within tent Glovebag removal within tent (check 3 through 8)
(11 Glovebag Removal Check 3 through 8) 3. Glovebags smoke-tested: Yes No 4, Glovebags attached to smooth surface; Yes No 5. Amended water used: Yes No 6. Removal included cleaning and encapsulation: Yes No 7. Open/damaged ends of insul. sealed: Yes No 8. Glovebags vacuumed, double-bagged: Yes No Continued on Back Form NY-8 1/01
CONFIDENTIAL, CITY_21MC100_003446168 SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008
NYC-WTC_000247602
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000247554
Project monitor log page for full-containment asbestos abatement, listing project staff and project type.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247594
Full-containment abatment monitor log—client, contractor, and location fields.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247688
Full-containment abatement monitor log with location and prep status.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000177434
Form recording details for a large-scale full-containment asbestos abatement project including contractor and location data.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247714
Project monitor log; encap/abate prep and contractor details.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247644
Project monitor log with client, contractor, and project details for abatement.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247676
Log for full-containment abatement project, includes location and prep details.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247682
Full-containment abatement project monitor log with location, project size, and tasks.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247548
Monitor log for large abatement project at Broadway site, date field present.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000177440
Form documenting the pre-abatement sampling or removal phase of an asbestos abatement project.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247634
Project monitor log for a large containment abatement project, with parties and dates.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247760
Project monitor log form noting client, contractor, and project status for containment work.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000247578
Project monitor log with client, contractor, and task details for containment work.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247694
Full-containment abatement monitor log showing project type and prep steps.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247766
Log of large containment project with contractor and task information.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247760
Project monitor log form noting client, contractor, and project status for containment work.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000177454
Application form for a permit covering a large-scale full-containment asbestos abatement project.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000177446
Form recording details for the preparation phase of a full-containment asbestos abatement project.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000247554
Project monitor log page for full-containment asbestos abatement, listing project staff and project type.
Similar indexed content
NYC-WTC_000247594
Full-containment abatment monitor log—client, contractor, and location fields.
Similar indexed content
NYC-WTC_000247688
Full-containment abatement monitor log with location and prep status.
Similar indexed content
NYC-WTC_000177434
Form recording details for a large-scale full-containment asbestos abatement project including contractor and location data.
Similar indexed content
NYC-WTC_000247714
Project monitor log; encap/abate prep and contractor details.
Similar indexed content