NYC-WTC_000247644
Project monitor log with client, contractor, and project details for abatement.
2 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗Full-containment abatement project monitor log with location, project size, and tasks.
NYC-WTC_000247682–000247683OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
ASSOCIATES INC PROJECT MONITOR LOG Part 1 i1. Client: 4. Project#: . 5, Work Area(s):
3. Pro^tM^ss^^^ Y 4a. Task #:
6. Contractor: 7. Contractor's Foreman: 8. ATC Representative; 9. Date:
Type of Project: Full-Containment Tent-Contain ment Glovebagging Other
Size of Project: Large (> 160 sq. ft., 260 lin. ft. of ACM) Small (< 160 sq.ft., 260 lin. ft.)
Phase of Abatement: Pre-abatement Sampling Prep Removal Cleaning
Encapsulation Waste Load-out Finals
FULL-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section):
Preparation of Work Area: Yes (Indicate prep work performed in 1 -10) N/A (If already completed)
1. Construction of Decon: Yes No 2. Ceiling Poly: Yes No 3. Critical Barriers (CBs): Yes No 4. Wall Poly: Yes No 5. Removal to establish CBs: Yes No 6. Floor Poly: Yes No 7. Negative air: Yes No 8. Pre-cleaning: Yes No 9. Prep work completed; Yes No 10. Temporary Power; Yes No 11. Other_______ Yes No 12. Prep-Inspection Passes: Yes No (Explain why)
Removal: Yes (Complete 1 - 5) N/A
1 Type of ACM: Pipe Insulation Duct Insulation Fireproofing Ceiling Tile Boiler Insulation Transite Boards Floor Tile Other;
2. Negative air pressure >. 0.02 in. of water; Yes No 3. Amended water used during removal: Yes No 4. Critical barriers intact for shift's duration: Yes No 5. Proper Decon procedures followed: Yes No
Cleaning: Yes (Complete 1 - 6 ) N/A
1. 1 st Stage 2nd Stage 3rd Stage 2 12/12-hour waiting period after 1 st cleaning; 3. Removal of 1st poly layer after 1st cleaning: Yes No 4. 4/12-hour waiting period after 2nd cleaning: Yes No 5. Removal of 2nd poly layer after 2nd cleaning: Yes No 6, 1/12-hour waiting period after 3rd cleaning: Yes No
TENT-CONTAINMENT ABATEMENT
Work Area Location (Noor, room, section):
Preparation of Work Area: Yes (Indicate prep work performed in 1 - 6) N/A (If already completed)
1. Construction of Tent; Yes No 2. Pre-cleaning: Yes No 3. Construction of Decon: Yes No 4. Negative Air; Yes No N/A 5. Prep work completed: Yes No 6. Pref-inspection passes: Yes No
Removal: 1. Type of ACM: Pipe Insulation Duct Insulation Fireproofing Ceiling Tile Boiler Insulation Transite Boards Floor Tile Other: 2. Method or Removal: Gross removal within tent Glovebag removal within tent (check 3 through 8)
(If Glovebag Removal Check 3 through 8) 3. Glovebags smoke-tested: Yes No 4. Glovebags attached to smooth surface: Yes No 5. Amended water used; Yes No 6. Removal included cleaning and encapsulation: Yes No 7. Open/damaged ends of insul. sealed: Yes No 8. Glovebags vacuumed, double-bagged: Yes No
Continued on Back Form NY-8 1/01
CONFIDENTIAL, CITY_21MC1OO_OO3446268 SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008
NYC-WTC_000247682
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000247644
Project monitor log with client, contractor, and project details for abatement.
2 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247714
Project monitor log; encap/abate prep and contractor details.
2 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000177434
Form recording details for a large-scale full-containment asbestos abatement project including contractor and location data.
2 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247760
Project monitor log form noting client, contractor, and project status for containment work.
2 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247688
Full-containment abatement monitor log with location and prep status.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247676
Log for full-containment abatement project, includes location and prep details.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247634
Project monitor log for a large containment abatement project, with parties and dates.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247594
Full-containment abatment monitor log—client, contractor, and location fields.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000177440
Form documenting the pre-abatement sampling or removal phase of an asbestos abatement project.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247554
Project monitor log page for full-containment asbestos abatement, listing project staff and project type.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247584
Monitor log page recording project type, location, and abatement phase.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247548
Monitor log for large abatement project at Broadway site, date field present.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000247594
Full-containment abatment monitor log—client, contractor, and location fields.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000177440
Form documenting the pre-abatement sampling or removal phase of an asbestos abatement project.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247676
Log for full-containment abatement project, includes location and prep details.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247710
Project monitor log for full-containment abatement, with project size and phase.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247584
Monitor log page recording project type, location, and abatement phase.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000177474
Project monitor log form for a large asbestos abatement project at a DEP site in September 2002.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000247644
Project monitor log with client, contractor, and project details for abatement.
Similar indexed content
NYC-WTC_000247714
Project monitor log; encap/abate prep and contractor details.
Similar indexed content
NYC-WTC_000177434
Form recording details for a large-scale full-containment asbestos abatement project including contractor and location data.
Similar indexed content
NYC-WTC_000247760
Project monitor log form noting client, contractor, and project status for containment work.
Similar indexed content
NYC-WTC_000247688
Full-containment abatement monitor log with location and prep status.
Similar indexed content