NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 427 pages

Permit application, Education Dept.

Machine-extracted title · confidence 15%

Permit application unrelated excerpt; contains mayoral report and NYC identifiers; likely overarching documents for school-related permit.

NYC-WTC_000245464–000245890
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Department of Parks and recreation

• DPR awarded a license for the operation and management of the Wollman and Lasker Rinks in Central Park. A minimum of $4 million in capital investments will be spent on work, which includes dasher board repairs, new skates and new rubber matting throughout both facilities. Mechanical upgrades for Wollman Rink include new boilers, renovated restrooms, rebuilt chillers, a new brine mixer, a new expansion tank and a rebuilt cooling tower. The City will receive a minimum of $17.5 million in guaranteed annual fees during the 11 operating seasons of this contract.

• In August 2001 DPR opened a cafe in Fort Tryon Park, which is operated by the New York Restoration Project. The building underwent extensive renovation, including installation of a new take-out snack bar with tables, a remodeled kitchen with new equipment, a new bar, remodeled restrooms and a renovated dining area with new lighting fixtures, wood paneling and restored doors.

In November 2001 DPR completed work on the new 1.7-mile Flushing Bay Promenade in Queens. The rehabilitation, funded by the Department of Environmental Protection (DEP), will increase access to Pier 1, which connects the East Elmhurst community with Flushing Meadows-Corona Park. Thousands of new trees and shrubs were added, as well as railings, new pavement, curbing, new lighting and seating. Eleven new overlooks offer improved visuals of the bay and link the entire promenade for uninterrupted pedestrian traffic. The project also includes the restoration of the two historic structures designed by Spanish architect Felix Candela for the 1964 World’s Fair.

• DPR plans to reconstruct and expand the entire southern end of Union Square Park in Manhattan. The park will be expanded by incorporating underused portions of 14’^ Street and Union Square West. The new park space will allow for improved east-west pedestrian flow as well as additional plantings. In coordination with DEP and DOT, DPR completed the replacement of a water main during the reporting period. Construction of the park began in October 2000 and is scheduled for completion in March 2002.

• In Queens, the Flushing Meadows-Corona Park Pool and Ice Rink will be the first pool opened by DPR in four decades. The 82,000-squar6 foot building will contain a 10-lane, Olympic-size public pool that will meet all competitive regulations. It will have moveable floors that can create a wading pool, a lap pool and the City’s only open diving pool. The building will also contain a National Hockey League-standard ice hockey rink, a year-round facility for competitive leagues and single skaters. Construction began in Summer 2001 and is scheduled for completion in Spring 2002.

• Construction of the Chelsea Recreation Center resumed in July 2001. The five-story building will include a finished basement, pool, gymnasium, roof playground, and rooms for aerobics, dance, computers and preschool activities. The project has been rescheduled for completion in June 2002 due to delays resulting from the September11*'^ disaster.

• In June 2001 DPR began construction on the Brooklyn Bridge Park project, which will include a waterfront park with a playground. In December 2001 DPR completed construction on the playground. The rest of Phase I, which includes a large, sloped lawn, an intertidal beach with access to the water and a riprap shoreline, is expected to be completed in Summer 2002. Brooklyn Bridge Park is expected to provide 70 acres of open space, replacing underused and derelict commercial waterfront property in downtown Brooklyn.

• In November 2001 the Administration and the Staten Island Borough President allocated $9 million to DPR to build a fishing pier at Midland Beach. The 30-foot wide T-shaped pier will stretch approximately 835 feet, extending from the existing boardwalk into the Lower Bay of New York Harbor. The pier will include fish cleaning stations, benches, pavilions and a new comfort station. Construction began in January 2002 and is scheduled for completion in Fall 2003.

173

CITyZSimcIOOJo1339 52 43

NYC-WTC_000245630

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000245630Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000195490

Invoice from the Office of Management and Budget regarding services provided by the Office of the Chief Medical Examiner in 2002.

Similar indexed content

Compare copies and versions →