NYC-WTC_000243508
FEMA project summary for PS 234 school clean-up at Greenwich Street.
6 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗Summary of FEMA disaster costs for PS 234 school cleanup project.
NYC-WTC_000243514–000243515OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Date- 07/17/2002 FEDERAL EMERGENCY MANAGEMENT AGENCY Project Completion and Certification Report (P.4) Disaster #: 1391
P.A. ID; 061-51000-22 Applicant; NEW YORK / EDUCATION, BOARD OF EDUC PW# VSN PKG# INF Cat Work Projected Approved PW % Actual Date Amt. Claimed Comments Done By Compl. Date Amt. Compl. Completed by Applicant at Insp.
483 0 46 N E 03/11/2003 $1,269,298 48 100% $ SITE NUMBER : 1 FACILITY NAME : PUBLIC SCHOOL 234 SCHOOL CLEAN UP
LOCATION 292 GREENWICH STREET, NEW YORK, NY 10282 W G SCOPE OF WORK WORK COMPLETE CONSISTS OF THE EXPENSES INCURRED SY THE NEW YORK CITY, BOARD OF EDUCATION (BOE) FOR THE WORK K PERFORMED BY THE SCHOOL CONSTRUCTION AUTHORITY (SCA). SCA WILL BE SUBMITTING ALL COSTS TO THE BOE FOR a REIMBURSEMENT. THESE COSTS INCLUDE THE CONTRACTUAL WORK FOR REMEDIATION AND RESTORATION OF PS 234 ON THE o o BASIS OF DESIGN, CAPACITY AND FUNCTION OF THE FACILITY PRIOR TO DISASTER AND IN CONFORMITY WITH APPLICABLE H o STANDARDS. a H a SCHOOL CONSTRUCTION AUTHORITY WAS RESPONSIBLE FOR THE COORDINATION AND CONSTRUCTION MANAGEMENT OF THE O o CONTRACTORS PERFORMING WORK AT PS 234 RELATED TO THE COLLAPSE OF WTC. COSTS ASSOCIATED WITH THE WORK a a PERFORMED BY SCA CONSISTS OF REGULAR TIME LABOR ($3,619.24), INCLUDING THE NEW YORK CITY REGULAR TIME FRINGE a a BENEFIT RATE FOR NON-UNIFORM EMPLOYEES OF 44.66% ($1,616 36). TOTAL INCURRED COST FOR REGULAR TIME LABOR IS o a $5,235.60. COSTS ASSOCIATED WITH THE OVERTIME FOR LABOR FOR SCA (10,007.66), INCLUDING THE NEW YORK CITY OVERTIME H a FRINGE BENEFIT RATE FOR NON-UNIFORM EMPLOYEES OF 110.73% ($1,073.83). TOTAL INCURRED COST FOR OVERTIME LABOR IS n a $11,081.49 H I—I H PAL ENVIRONMENTAL SAFETY CORP. (PAL) AND KISS CONSTRUCTION PERFORMED CLEAN UP AND REMEDIATION OPERATIONS OF < a aco THE INTERIOR OF THE BUILDING, AS WELL AS PRESSURE WASHING THE EXTERIOR. CITYWIDE ENVIRONMENTAL SERVICES LLC G CLEANED THE HVAC SYSTEM OF DUST AND DEBRIS. CORINTHIAN CONSTRUCTION CO, INC. WAS RESPONSIBLE OF CLEARING o a DEBRIS FROM THE ROOF OF SCHOOL. GRAVEL WAS REMOVED FROM THE ROOF, THE ROOF MEMBRANE WAS PRESSURE a WASHED, AND NEW GRAVEL WAS PLACED ON THE ROOF. TAYLOR ENVIRONMENTAL GROUP, INC. CONDUCTED QUALITY o a a o CONTROL AIR MONITORING AND ANALYTICAL SERVICES, AS WELL AS VISUAL INSPECTIONS TO DETERMINE THE PRESENCE OF a a FINE PARTICULATE DUST. WARREN & PANZER ENGINEERS (WARREN & PANZER) CONDUCTED AGGRESSIVE SAMPLING AND TRANSMISSION ELECTRON MICROSCOPY (TEM) ANALYSIS OF SERVAL FLOORS AND THE HVAC UNIT. TDX/BECOM PERFORMED a CONSTRUCTION OVERSIGHT OF ALL CONTRACTUAL ACTIVITIES TO I o a a SCOPE OF WORK NSURE QUALITY OF WORK. TOTAL CONTRACTUAL COSTS SUBMITTED TO BOE FROM SCA FOR THIS PROJECT WORKSHEET IS o $1,252,981.09
SEE NARRATIVE FOR DETAILED DESCRIPTION OF I HE WORK PERFORMED BY SCA AND EACH CONTRACTOR AS WELL AS THEIR w H RESPECTIVE COSTS. a a o TOTAL COSTS ASSOCIATED WITH THIS PROJECT WORKSHEET FOR CONTRACTUAL WORK AND LABOR IS $1,239,298.48 I ] a
to o o 03
O
H a I to
S o
o I o o co Page 1 of 3 O', to co cn CO
NYC-WTC_000243514
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000243508
FEMA project summary for PS 234 school clean-up at Greenwich Street.
6 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000411641
FEDERAL EMA grants summary for PS 234 cleanup costs; site location provided.
6 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243505
FEMA/BOE project summary for PS 234 school clean-up at 292 Greenwich Street.
5 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000411645
FEMA/BOE cost summary for BOE project at 201 Warren Street, including remediation and restoration expenses.
4 shared non-person entities · 1 shared topics · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000411644
FEMA project worksheet for PS 89 remediation under disaster 1391.
4 shared non-person entities · 1 shared topics · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000411638
FEMA project summary for PS 234 site mitigation and cost reimbursement.
6 shared non-person entities · 1 shared topics · similarity 0.954
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243511
FEMA project summary for PS 234 school cleanup at 292 Greenwich Street.
6 shared non-person entities · 1 shared topics · similarity 0.953
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279707
P.A. ID, site number, location, scope of work for PS 234 remediation and BOE res**
6 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000251592
Emergency management project summary for NYC Board of Education disaster costs at PS/IS 89, 2017.
4 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279710
Project application summary for FEMA disaster 1391; reveals site and cost figures.
6 shared non-person entities · 1 shared topics · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267441
FEMA disaster project data for New York City Education Board site remediation and SCA work.
6 shared non-person entities · 1 shared topics · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263574
Emergency management project summary for BOE facility at 201 Warren Street.
4 shared non-person entities · 1 shared topics · similarity 0.946
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000243508
FEMA project summary for PS 234 school clean-up at Greenwich Street.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000411641
FEDERAL EMA grants summary for PS 234 cleanup costs; site location provided.
Similarity score 0.987 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243505
FEMA/BOE project summary for PS 234 school clean-up at 292 Greenwich Street.
Similarity score 0.987 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243505
FEMA/BOE project summary for PS 234 school clean-up at 292 Greenwich Street.
Similarity score 0.985 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243508
FEMA project summary for PS 234 school clean-up at Greenwich Street.
Similarity score 0.983 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000251592
Emergency management project summary for NYC Board of Education disaster costs at PS/IS 89, 2017.
Similarity score 0.983 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000243508
FEMA project summary for PS 234 school clean-up at Greenwich Street.
Similar indexed content
NYC-WTC_000411641
FEDERAL EMA grants summary for PS 234 cleanup costs; site location provided.
Similar indexed content
NYC-WTC_000279707
P.A. ID, site number, location, scope of work for PS 234 remediation and BOE res**
Similar indexed content
NYC-WTC_000251592
Emergency management project summary for NYC Board of Education disaster costs at PS/IS 89, 2017.
Similar indexed content
NYC-WTC_000243505
FEMA/BOE project summary for PS 234 school clean-up at 292 Greenwich Street.
Similar indexed content