NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

FEMA Project Worksheet, DR- NY 2001

Machine-extracted title · confidence 28%

FEMA project worksheet related to disaster 1391 and 2001-2002 funding paperwork.

NYC-WTC_000243503
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

lO 5. oi

I? FEDERAL EMERGENCY MANAGEMENT AGENCY C.M.S. No, 3067-0161 PROJECT WORKSHEET Expires April 30, 2001

PAPERWORK BURDEN DISCLOSURE NOTICE PuMkC ^•porti<^g burden lot this form is estimated to average 30 minutes. The burden estimate includes the time foi reviewing inMrucliont. Marching existing data sources, gathering and maintaining the needed data, and c ompleting and submitting the forms. You nol required lo respond to this collection of information unless a valid 0MB control number is displayed in the upper right corner ol Ihe lorms. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing the burden to; Inlomieiion Colieciion Management. Federal Emergency Management Agency. 600 C Sheet. SW, Washingion, DC 20472. Ptpyrwofk Reduction Project (3067-0151). NOTE: Do not send your completed form to this address. bCciSRA^lONNO: PROJECl NO. FIPS NO. DATE CATEGORY rCMA* 1391 -DR- NY BoLoZijA 061-51000-22 02/27/02 E OAMAGE FACILITY WORK COMPLETE AS OF; Public School 234 School Clean Up 10/31/01 100 % Applicant COUNTY New York City, Board of Education New York location LATITUDE I LONGITUDE 292 Greenwich Street. New York, NY 10282 DAMAGE DESCRIPTION AND DIMENSIONS

The collapse o’ Ihe World Irade Center (WTC) on September 11. 2001 caused e massive cloud of concrete and dust to impact neighboring buildmgs blocks away from the World Trade Center complex. Public School 234 (PS 234)’ is located at 292 Greenwich Sneet. apprcximgiely iwo-lenihs of s mile from One WTC. The dust cloud from the collapse of One WTC directly impacted the PS 234 lacihiy end covered the building with a layer of dust. Dust ano debris entered the but Iding through the ventilalion system and through oper^ windows and doors. In addition, PS 234 was also used as a relief center to provide equiprineni, food, shelter, showers, change of clothes, end cuppiiec tor the emergency rescue and recovery workers. V/ork IC clean PS 234 was pertormed from September 25, 2001 Illi (October 31.2001.

SCOPE OF WORK

Work complete consists of the expenses incurred by the New York City. Board of Education (BoE)for the work periormed by the School Consiruclton Authority (SCA). SCA will be submitting all costs to the BoE for reimbursement These costs irKlude the contractual work for remediation and restorabon of PS 234 on the basis of design, capacity and function of the facility prior to the and in conformity with appticabie standards.

Sctx>ol Construction Authority was responsible for the coordination and construction management of the contractors performing work at PS 234 related to the collapse of WTC. Costs associated with the work performed by SCA consists of regular time tabor ($3,619.24), including the New Y ork City regular time fringe benefit rate for non-uniform employees of 44.66% ($1,616.36). lotel incurred cost for regular time labor is $5,235.60. Costs associated with the overtime for labor for SCA (10,007.66), Including Ihe New York City overtime fringe benefit rate for non-uniform employees of 10.73% ($1,073.83). Total incurred cost for ovanime labor is $11,081.49.

PAL tnv-ronmentai Safety Corp. (PAL) and KISS Construction performed clean up and remediation operations of Ihe interior of the building. well as pressure washing the exterior. Citywide Environmental Services LLC cleaned Ihe HVAC system of dust and d#l»ni Corinthian Consiruclion Co, Inc. was responsible of clearing debris from the roof of the school. Gravel was removed from the roof, the roof membrane was pressure washed, and new gravel was placed on the roof, Taylor Environmental Group, Inc conducted qu»iHy control air monitoring and analytical services, as well 3S visual inspections 10 determine the preserree of fine oarticulale dust. Wtirrn & Panzer Engineers (Warren & Panzer) conducted aggressive sampling and transmission electron microscopy (TEM) analysis pl aaverai floors and the HVAC unit. TDX/Becom performed construction oversight of all contractual activities to insure quality of work. Total contfactuai costs submitted to BoE from SCA for this project worksheet is $1.252,961.39.

hM'rehve b’ deiailec description of the work perlormefl by SCA and each contractor, as well as their respective costs.

Ipim costs fissociaied with this project worksheet for contractual work and labor is $1,269,298.48.

ihe Scope of Work change the pre-di saster condition at site? □ Ves H No Bpecial Consideration issues included? Yes } | No Hazard Mitigation proposal included? | | Yes [X] Mo In there insurance coverage on facility'’ Yes 13 No PROJECT COST ITEM CODE NARRATIVE OUANTITY/UNIT I UNIT price" COST 9003 Contract - School Construction Authority 1 LS 1 $1,252,981.39 $ 1,252.961.39 2 9007 Labor • Regular Time w/ fringe________ 7 / LS I $5 5.235,60 S_______ 5,235.60 3 9007 Labor ■ Overtime w/ fringe 1 / LS I$11,081.49 $11,081.49

Total 1,269,298 48 PRE PARE0 BY; Dan Martin REMARKS Project Officer I LMA Form 90-91 SEP 96

CONFIDENTIAL INSURANCE INFORMATION, CITY_21MC100_008628525

SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000243503

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000243503Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

FEMA Project Worksheet · page 1

NYC-WTC_000251589

FEMA project worksheet and paperwork burden disclosure for disaster-related work.

Similarity score 0.990 (not a probability)

machine-extracted · confidence unavailable · Check page ↗

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

FEMA project worksheet, 2001

NYC-WTC_000385737

FEMA 1391-DR-NY worksheet; declaration, project, and narrative overview.

Similar indexed content

NYC-WTC_000219967

Federal Emergency Management Agency paperwork worksheet declaring project details and burden disclosure for disaster relief efforts dated September 30, 2001.

Similar indexed content

Compare copies and versions →