NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 55 pages

WTC redevelopment proposal, Law Department, 2001

Machine-extracted title · confidence 40%

Proposal for services related to World Trade Center cleanup project.

NYC-WTC_000243370–000243424
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Robert P. Coyne, Jr. page 2

Airport. He supervised and inspected all aspects of roadway, utility and bridge construction; managed and coordinated all Bechtel field supervisory personnel; and developed, scheduled, and implemented construction sequencing and staging. He also interfaced and coordinated daily with Port Authority and airline facility managers to provide for minimal disruption to services within the central terminal area.

Assistant Construction Resident. Mr. Coyne assisted the regional engineer with contract administration. He logged and tracked all job submittals; developed and maintained cost reports; negotiated and administered change orders; and monitored construction schedules. He also assisted with constructibility studies for upcoming redevelopment projects, and served as construction resident for two landscaping contracts.

1992 Grade Industries, Inc., Queens, New York. Assistant Superintendent. Mr. Coyne supervised and coordinated a direct hire labor force that peaked at 70 persons during the construction of roadway bridges associated with Roadways Construction Package No. 2 of the JFK Redevelopment Program. He supervised the construction activities of pile installation, concrete formwork, steel erection asphalt placement and utility installation. He also coordinated the work of subcontractors.

1991 Leigh Construction Co., Syracuse, New York. Assistant Project Manager. Mr. Coyne was responsible for estimating small to medium size projects and tracking all job costs. He prepared subcontracts, coordinated the schedules of subcontractors, and verified the quality of subcontractor work. He also wrote and administered change orders.

1990 Flagstaff Construction Corp., New York, New York. Assistant Superintendent. Mr. Coyne supervised and coordinated a direct hire labor force during interior renovation projects. He supervised the construction activities of mechanical, electrical, and architectural interior installation. He also coordinated the work of subcontractors.

1989 HNTB Corporation, Fairfield, New Jersey. Lab/Field Technician. Mr. Coyne worked in the field, performing gradation, proctor, permeability and plasticity indicator tests on soils. He also prepared and tested marshall plugs.

01090

CITY_21 MC100_014587522

NYC-WTC_000243398

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000243398Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →