NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 55 pages

WTC redevelopment proposal, Law Department, 2001

Machine-extracted title · confidence 40%

Proposal for services related to World Trade Center cleanup project.

NYC-WTC_000243370–000243424
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Robert P. Coyne, Jr. Infrastructure and Utility Coordination

Summary Mr. Coyne has more than 10 years of New York area heavy construction experience, 8 of which have been with Bechtel Construction. He is currently utilities coordinator for the AirTrain Light Rail to JFK International Airport project. Mr. Coyne is particularly skilled in accomplishing construction goals in a busy operating environment. He has been a key member of the construction team at JFK International Airport since 1992, where he served as an assistant superintendent, then superintendent, field coordinator, and construction resident on the heavy road and bridge construction for the central terminal area roadways. His work with subcontractors in the complex phasing and tight constraints of maintaining schedule within an operating airport, as well as the construction of AirTrain structures amid heavy freeway and airport traffic, has given him an important understanding of how to get the job done in the midst of other activities.

Education B.S., International Relations, Syracuse University, 1991

Relevant Experience

1998 - Present AirTrain Light Rail to JFK International Airport, Jamaica, New York. Utilities Coordinator. Mr. Coyne is responsible for the substantial utility relocation required in the central terminal area, for the cut-and- cover tunnels under the taxiways, and along the entire alignment of the guideway. Relocations included 5kV ducts, gas lines, high pressure water lines, chilled water lines, high temperature water lines, drainage, and lighting conduits. This 8.4-mile project includes 10 stations and is being built largely on viaduct, both at the airport and in the median of the VanWyck Expressway, while maintaining full operating conditions. The project also entails construction of tunnels under two taxiways.

1993 -1998 John F. Kennedy International Airport Redevelopment, Jamaica, New York. Construction Resident. Mr. Coyne was responsible for the day-to-day management and supervision of Roadway Construction Package No. 4. He supervised and managed Bechtel office and field personnel, developed and maintained cost reports, and negotiated and administered change orders. He also monitored and developed construction schedules. Mr. Coyne’s duties included correspondence with and assistance to subcontractors in solving complex construction staging problems that arose due to the complexity of working in the environment of an operating airport serving more than 30 million passengers annually.

Project Field Coordinator. Mr. Coyne coordinated all field activities for roadways projects within the redevelopment program at JFK International

01090

CITY_21 MCI 00_014587521

NYC-WTC_000243397

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000243397Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →