NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 55 pages

WTC redevelopment proposal, Law Department, 2001

Machine-extracted title · confidence 40%

Proposal for services related to World Trade Center cleanup project.

NYC-WTC_000243370–000243424
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Thomas Esselstrom Project Controls Manager

Summary Mr. Esselstrom is a project controls professional with more than 27 years of experience in cost estimating, and schedule and cost controls for major construction projects. He is well versed in the challenges of maintaining cost, schedule, and quality parameters in a time-limited environment. His experience spans a wide range of industries, and he was a member of the team that was recognized with the Silver Hammer Award from the Department of Energy (DOE) for saving taxpayers $20 million on an environmental restoration project in Washington State. Mr. Esselstrom is experienced with large, complex projects requiring management control systems to be integrated with the owner’s processes. He is skilled with current web-based applications and their effective use on projects with many entities participating.

Education M.S., Engineering Management, Washington State University, 1996 B.S., Industrial Technology, University of Wisconsin-Stout, 1973

Professional Data American Association of Cost Engineers

Relevant Experience

1997 — Present Portland Airport MAX Light Rail Transit Extension, Portland, Oregon. Project Controls Manager. Mr. Esselstrom was responsible for establishment and management of project controls systems for the highly successful design-build of this 5.5-mile light rail transit extension. The project achieved all contractual milestones and opened for passenger service in September 2001. Mr. Esselstrom’s specific duties included oversight of schedule and cost control, the trend program, estimating, configuration management, information systems, document control, and progress reporting, as well as other control functions. He oversaw the work of nine major subcontractors and 15 minor subconsultants and supervised six project controls professionals.

1994 -1997 Bechtel Hanford Environmental Restoration, Richland, Washington. Project Controls Supervisor. Mr. Esselstrom was a key controls manager on this project, which received the Silver Hammer Award from the National Performance Review Board of the Department of Energy (DOE) for saving taxpayers $20 million. He was responsible for overall change control and trend programs; managed the contract funding allocation by DOE Budget and Reporting Classification and Activity Data Sheet; maintained the department operations plan; and provided validation and documentation of program cost savings. He supervised a staff of 20 project controls professionals.

01090

CITY_21 MCI 00_014587523

NYC-WTC_000243399

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000243399Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →