Summary of Asbestos Sampling Results Page 2 of 3
Address: 120 Greenwich Street Date sampled: November 16, 2001
the fibers were asbestos. In this building, additional analysis was not v/arranted since the air
sampling results were not greater than 0.003 f/cc.
ResultsofPhaseContost^licroscopy(PCM)testingofairaH20G^inwichSt^Noy^l6^001
Area Sampled Outside Outside Common Residence 1
I...-..I ..
Residence 2
Sample Numbers A-0-5-2* A-C-5 A-Rl-5 A-R2-5
A-0-5-1
Concentration of Fibers in Air
0.002 0.003 0.002 0.002 <0.001
at 120 Greenwich Street
(f/cc)**
Concentration of Fibers (f/cc) <0.001 to 0.001 <0.001 to 0.001 <0.001 to 0.002 <0.001 to 0.003 <0.001 to 0.003
in comparison locations
NYC Re-occupancy 0.01 0.01 0.01 0.01 0.01
Standard (f/cc)***
* Denotes a second air sample in the same location.
** f/cc is fibers in each cubic centimeter (cc) of air. This is calculated from the number of fibers seen on the air filter
and the volume of air pulled through the filter measured in cubic centimeters of air.
*** New York City Department of Environmental Protection asbestos clearance criteria for post-abatement work
(Rules of the City of New York, Title 15, Chapter 1)
ASBESTOS DUST TEST RESULTS
The dust and debris samples were examined by two different laboratory methods for asbestos
fibers, Polarized Light Microscopy (PLM) and Transmission Electron Microscopy (TEM). PLM
is used to define asbestos containing material in dust and debris. A material is considered to be
asbestos containing material if it contains more than 1% asbestos using the PLM method. The
PLM method only counts the larger asbestos fibers. Therefore, if results by PLM were not greater
than 1% asbestos, the sample was then analyzed by the TEM method that does count the smaller
fibers. However, TEM analysis is not used for regulatory purposes for dust samples.
Asbestos was found (greater than 1% using the PLM method) in a small amount of dust outside
your building, near the front entrance. DOH and the City Department of Environmental
Protection (DEP) inspected the building after the sampling was conducted to determine if further
action was warranted. The inspection revealed that no visible dust or debris was present and no
additional action was needed. Low levels of asbestos were also found (less than 1% using the
PLM and TEM methods) in the dust in the residences of your building. However, the
concentration of asbestos found in this sample did not warrant the use of an asbestos abatement
contractor.
Fibrous materials in dust found by PLM analysis: Polarized Light Microscopy identifies
asbestos fibers by shape and optical characteristics. Other fibers such as fabric (synthetics),
paper (cellulose) and fiberglass may be identified in the analysis. The laboratory analyst counts
the Summary of Asbestos Sampling Results Page 3 of 3
CONFIDENTIAL, CITY_21MC100_003423630
SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008
NYC-WTC_000242853
OCR can misread numbers and units. Confirm readings against the page image before using them.